Water Treatment Practice Quiz

Water Treatment Practice Quiz

University

37 Qs

quiz-placeholder

Similar activities

Earth's Waters

Earth's Waters

8th Grade - University

32 Qs

Module 1 Beginning With Science

Module 1 Beginning With Science

7th Grade - University

38 Qs

GP3 Review

GP3 Review

7th Grade - University

32 Qs

Thinking 1: Problem-solving

Thinking 1: Problem-solving

University

38 Qs

chemistry of organic electronics

chemistry of organic electronics

University

32 Qs

Adaptation

Adaptation

4th Grade - University

37 Qs

EEOM Quiz 2

EEOM Quiz 2

University

36 Qs

Week One  Mastery

Week One Mastery

11th Grade - University

40 Qs

Water Treatment Practice Quiz

Water Treatment Practice Quiz

Assessment

Quiz

Science

University

Hard

NGSS
MS-ESS2-4, MS-ESS3-1, HS-ETS1-3

+4

Standards-aligned

Created by

Jenny Johnson

FREE Resource

37 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

45 sec • 1 pt

What is the minimum water system demand?

200 gallons per day, 5 gallons per 10 minutes

150 gallons per day, 5 gallons per 10 minutes

100 gallons per day, 10 gallons per 10 minutes

300 gallons per day, 10 gallons per 10 minutes

2.

MULTIPLE CHOICE QUESTION

45 sec • 1 pt

What is friction head?

Direct, strong pressure when water flows

Loss of pressure when water flows

Pressure increases when water flows

3.

MULTIPLE CHOICE QUESTION

45 sec • 1 pt

What is the ratio of psi/ feet of head?

1 psi = 3.3' of head

1 psi = 1.3' of head

1 psi = 2.9' of head

1 psi = 2.3' of head

4.

MULTIPLE CHOICE QUESTION

45 sec • 1 pt

Who is responsible for permits for well construction?

Owner/agent

Well company

The county

The state

5.

MULTIPLE CHOICE QUESTION

45 sec • 1 pt

What is a Class III well?

A public well used for a small business

A private well use for drinking water.

A public well used for many businesses.

Tags

NGSS.MS-ESS2-4

NGSS.MS-ESS3-1

6.

MULTIPLE CHOICE QUESTION

45 sec • 1 pt

What is the minimum annular space?

Bored wells - 3" each side

Cased wells - 1.5" each side

Bored wells - 6" each side

Cased wells - 2.5" each side

Bored wells - 1" each side

Cased wells - 4.5" each side

Bored wells - 1.5" each side

Cased wells - 3" each side

7.

MULTIPLE CHOICE QUESTION

45 sec • 1 pt

What is a de-watering well?

A well kept in operation for 60 days or less for the sole purpose of lowering the water table.

A well kept in operation for 100 days or less for the sole purpose of increasing the water table.

A well kept in operation for 160 days or less for the sole purpose of lowering the water table.

Tags

NGSS.MS-ESS2-4

Create a free account and access millions of resources

Create resources
Host any resource
Get auto-graded reports
or continue with
Microsoft
Apple
Others
By signing up, you agree to our Terms of Service & Privacy Policy
Already have an account?