Plumbing Commissioning Quiz

Plumbing Commissioning Quiz

12th Grade

15 Qs

quiz-placeholder

Similar activities

Sports

Sports

7th Grade - University

20 Qs

 Class III Prepositions & Conjunctions

Class III Prepositions & Conjunctions

3rd Grade - University

20 Qs

Properties of Parallelograms

Properties of Parallelograms

10th Grade - University

11 Qs

Natural and built environment

Natural and built environment

11th - 12th Grade

15 Qs

(15) Hour Blueprint Reading Test

(15) Hour Blueprint Reading Test

9th - 12th Grade

20 Qs

Building Laws Quiz 1- PD 1096

Building Laws Quiz 1- PD 1096

KG - Professional Development

15 Qs

Multiviews

Multiviews

9th - 12th Grade

15 Qs

Civil Engineering Bridge Construction Quiz

Civil Engineering Bridge Construction Quiz

12th Grade

15 Qs

Plumbing Commissioning Quiz

Plumbing Commissioning Quiz

Assessment

Quiz

Architecture

12th Grade

Practice Problem

Medium

Created by

Gary Waller

Used 2+ times

FREE Resource

AI

Enhance your content in a minute

Add similar questions
Adjust reading levels
Convert to real-world scenario
Translate activity
More...

15 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the role of the commissioning process in conserving energy usage?

Setting the shut off levels of float operated valves

Checking flow rates at outlets

Filling each system with water

Ensuring proper system design

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is a crucial part of any installation according to the Building Regulations?

Balancing central heating systems

Customer interaction

System design

Flushing the system

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What should be explained to the customer during system handover to ensure energy efficient performance?

How to install the system

How to design the system

How to operate the system controls

How to manufacture the system components

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is a requirement of Document L1A/B regarding the customer's interaction with the system?

Providing additional components for the system

Providing a warranty for the system

Providing sufficient information for operation and maintenance

Providing free maintenance for the system

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What should be shown to the customer during system handover to ensure energy efficient performance?

The appliance, controls, and thermostats

The manufacturing process of components

The installation process

The system design

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What should the customer be given careful and precise instruction on during system handover?

How to operate and maintain the system

How to design a new system

How to install the system

How to manufacture the system components

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is a crucial part of the commissioning process to ensure optimum performance?

Filling each system with water

Flushing the system

Balancing central heating systems

Setting the shut off levels of float operated valves

Create a free account and access millions of resources

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

Already have an account?