Plumbing Commissioning Quiz

Plumbing Commissioning Quiz

12th Grade

15 Qs

quiz-placeholder

Similar activities

Planning the Sleeping Area

Planning the Sleeping Area

9th - 12th Grade

10 Qs

salesmanship EV

salesmanship EV

1st Grade - University

10 Qs

Monuments of India

Monuments of India

KG - Professional Development

10 Qs

Excavation Machines and Material Handeling

Excavation Machines and Material Handeling

9th - 12th Grade

10 Qs

Area and Perimeter

Area and Perimeter

4th Grade - University

10 Qs

Drywall Installation Mastery

Drywall Installation Mastery

12th Grade

10 Qs

fire da baby

fire da baby

12th Grade

10 Qs

Ancient Architecture

Ancient Architecture

KG - University

20 Qs

Plumbing Commissioning Quiz

Plumbing Commissioning Quiz

Assessment

Quiz

Architecture

12th Grade

Medium

Created by

Gary Waller

Used 2+ times

FREE Resource

15 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the role of the commissioning process in conserving energy usage?

Setting the shut off levels of float operated valves

Checking flow rates at outlets

Filling each system with water

Ensuring proper system design

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is a crucial part of any installation according to the Building Regulations?

Balancing central heating systems

Customer interaction

System design

Flushing the system

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What should be explained to the customer during system handover to ensure energy efficient performance?

How to install the system

How to design the system

How to operate the system controls

How to manufacture the system components

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is a requirement of Document L1A/B regarding the customer's interaction with the system?

Providing additional components for the system

Providing a warranty for the system

Providing sufficient information for operation and maintenance

Providing free maintenance for the system

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What should be shown to the customer during system handover to ensure energy efficient performance?

The appliance, controls, and thermostats

The manufacturing process of components

The installation process

The system design

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What should the customer be given careful and precise instruction on during system handover?

How to operate and maintain the system

How to design a new system

How to install the system

How to manufacture the system components

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is a crucial part of the commissioning process to ensure optimum performance?

Filling each system with water

Flushing the system

Balancing central heating systems

Setting the shut off levels of float operated valves

Create a free account and access millions of resources

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

By signing up, you agree to our Terms of Service & Privacy Policy

Already have an account?