
SFAR
Authored by Elai Enriquez
Other
Professional Development
Used 1+ times

AI Actions
Add similar questions
Adjust reading levels
Convert to real-world scenario
Translate activity
More...
Content View
Student View
49 questions
Show all answers
1.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
BEFORE YOU DO WORK IN A FUEL TANK
Pre entry checklist (AMM)
Do a check of the electrical bond
Never assume, don't deviate, consult engineer
2.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
PERMISSION FOR TANK ENTRANCE MUST BE ISSUED
Accountable manager
Maintenance supervisor
3.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
ALL REMOVED TANK COMPONENTS MUST BE REGISTERED IN
Ground log book (GLB) and Event ground log book (EGLB)
ALI ( Airworthiness Limitation Inspection) and Ground log book (GLB)
Event ground log book (EGLB) and ALI ( Airworthiness Limitation Inspection)
4.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
REPETITIVE INSPECTION
ALI ( Airworthiness Limitation Inspection)
BOEING
ALI ( Maintenance/Inspection)
AIRBUS
5.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
CDCCL
Pre entry checklist
Do a check of the electrical bond
Never assume, don't deviate, consult engineer
6.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
NGS SHUT OFF VALVE
Critical Design Configuration Control Limitations
Electrically operated and Pneumatically controlled
Electrically controlled and Pneumatically operated
7.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
REMOVES OZONE FROM THE ENGINE BLEED AIR BY A CATALYTIC PROCESS THAT CONVERTS OZONE TO OXYGEN
Nitrogen enriched air (NEA)
Ozone converter
Nitrogen generation system
Access all questions and much more by creating a free account
Create resources
Host any resource
Get auto-graded reports

Continue with Google

Continue with Email

Continue with Classlink

Continue with Clever
or continue with

Microsoft
%20(1).png)
Apple
Others
Already have an account?