Building and Structures Design Quiz

Building and Structures Design Quiz

Professional Development

99 Qs

quiz-placeholder

Similar activities

Upland Paraeducator Certification Test

Upland Paraeducator Certification Test

Professional Development

98 Qs

Education

Education

Professional Development

100 Qs

Weather

Weather

KG - Professional Development

100 Qs

D41 MASTER THE DAY

D41 MASTER THE DAY

Professional Development

100 Qs

TAT VIBHAG-1 QUIZ - 1

TAT VIBHAG-1 QUIZ - 1

Professional Development

99 Qs

Health and Safety

Health and Safety

Professional Development

100 Qs

TO 1

TO 1

7th Grade - Professional Development

100 Qs

Module 5-7_Seminar

Module 5-7_Seminar

Professional Development

104 Qs

Building and Structures Design Quiz

Building and Structures Design Quiz

Assessment

Quiz

Education

Professional Development

Hard

Created by

James Jones

FREE Resource

99 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the primary role of surveyors in the context of building and structures design?

To design the building's architecture

To take exact measurements and determine property boundaries

To manage the construction workforce

To install building services

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which of the following is NOT listed as a learning outcome for the chapter on the built environment life cycle?

Understand the design of buildings and structures

Know the planning process

Learn the cost estimation for construction projects

Know the types and purposes of maintenance of buildings, structures, and installed services

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Why is it important to consider reusing existing buildings and recycling materials from demolished buildings?

To increase the cost of construction

To support a sustainable built environment

To create more jobs in the construction sector

To make the construction process more complex

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the purpose of setting out levels in surveying activities according to Table 3.1?

To calculate the volume of soil and other loose materials

To establish heights and depths of roads in relation to the surrounding landscape

To determine the location of infrastructure elements such as roads, bridges and tunnels

To calculate surface area of ground for drainage requirements

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is a datum as defined in the 'KEY TERMS' section?

A method used to calculate area and volume

A specified angle of slope between two points

A fixed point or height from which reference levels can be taken

A tool used to determine positions on a site

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

According to the 'Surveying principles' section, what is important to ensure about a temporary bench mark (TBM)?

It must be moved regularly to accommodate construction activities.

It should be disturbed by machinery movements as needed.

It must not be disturbed to maintain accurate levels for buildings and structures.

It should be replaced by a permanent structure as soon as possible.

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What can sometimes be used as a datum according to the 'INDUSTRY TIP'?

A temporary bench mark (TBM)

A construction blueprint

An inspection-chamber cover in a road near to the site

A surveying instrument

Create a free account and access millions of resources

Create resources
Host any resource
Get auto-graded reports
or continue with
Microsoft
Apple
Others
By signing up, you agree to our Terms of Service & Privacy Policy
Already have an account?