Search Header Logo

106 ppt 9 Quiz on Off-Site Construction

Authored by John Harris

Education

1st Grade

Used 2+ times

  106 ppt 9 Quiz on Off-Site Construction
AI

AI Actions

Add similar questions

Adjust reading levels

Convert to real-world scenario

Translate activity

More...

    Content View

    Student View

18 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What are sub-assemblies in off-site construction?

Components that are manufactured on-site and used as part of the construction programme

Components that are manufactured off-site and require skilled assembly on-site

Pre-designed architectural models for construction projects

Tools and equipment used for on-site construction work

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which of the following is NOT a component that may form sub-assemblies in off-site construction?

I-joists

Paints

Roof systems

Floor systems

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is required for the delivery of sub-assemblies in off-site construction?

Immediate installation upon delivery

Delivery, storage, and skilled assembly as part of the construction programme

No storage or assembly, just direct incorporation into the building

Only storage without the need for skilled assembly

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What are components in off-site construction?

Tools used for on-site construction

Constituent parts of a building made as independent units from one supplier

The main structure of a building

The blueprint and design plans for a building

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which of the following is NOT a use for the term 'components' in off-site construction?

Vapour barriers

Cladding

Electrical wiring systems

Curtain walling panels

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is an open system in off-site construction panelised systems?

Insulated, sheeting on both sides and a service zone.

Made with structural elements only, non-insulated, occasionally one side is sheeted.

Variation of closed panels; solid insulation ‘sandwiched’ with two layers of oriented strand board (OSB).

A system that uses glass panels exclusively.

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What characterizes a closed system in off-site construction panelised systems?

Made with structural elements only, non-insulated, occasionally one side is sheeted.

A system that uses glass panels exclusively.

Insulated, sheeting on both sides and a service zone.

Variation of closed panels; solid insulation ‘sandwiched’ with two layers of oriented strand board (OSB).

Access all questions and much more by creating a free account

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

Already have an account?