Search Header Logo

Central Heating revision | 6035

Authored by George Harding

Professional Development

Professional Development

Used 323+ times

Central Heating revision | 6035
AI

AI Actions

Add similar questions

Adjust reading levels

Convert to real-world scenario

Translate activity

More...

    Content View

    Student View

22 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Media Image

Identify what type of system is shown here.

C plan plus

Semi gravity system

Unvented system

Full gravity pumped system

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

To conform with European standard, all radiators manufacture must comply with:

BS 4422

BS 6700

BS EN 442

BS EN 104

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Media Image

The type of system shown can be identified as?

W-plan system

S-plan system

Y-plan system

Combination boiler system

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Media Image

On a three port mid-position valve, what does port 'A' supply?

The boiler

Central heating circuit

F&E cistern

Hot water circuit

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

The most common arrangement of radiator valve is:

BBOE

TBOE

TBSE

TTOE

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Media Image

The type of radiator shown here is?

Double panel with single convector

Single panel with double convector

Double panel

Single panel with single convector

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Dependant of the skirting, what is the typical height that you should install radiators from floor level?

100mm

150mm

200mm

250mm

Access all questions and much more by creating a free account

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

Already have an account?

Discover more resources for Professional Development