Plumbing Quiz

Plumbing Quiz

Professional Development

40 Qs

quiz-placeholder

Similar activities

Last quiz JJ Mri

Last quiz JJ Mri

Professional Development

36 Qs

100 WK 1 Heart Anatomy

100 WK 1 Heart Anatomy

Professional Development

43 Qs

Pdpl

Pdpl

Professional Development

35 Qs

BANK SOAL FISIKA FINAL

BANK SOAL FISIKA FINAL

8th Grade - Professional Development

40 Qs

Sanitary Pipework Systems Quiz

Sanitary Pipework Systems Quiz

Professional Development

36 Qs

Phase 1 Sanitary systems checkpoint test

Phase 1 Sanitary systems checkpoint test

Professional Development

40 Qs

Gambar Teknik Masin

Gambar Teknik Masin

Professional Development

45 Qs

BCM -I Insem Examination

BCM -I Insem Examination

University - Professional Development

40 Qs

Plumbing Quiz

Plumbing Quiz

Assessment

Quiz

Other

Professional Development

Hard

Created by

Andy Roper

FREE Resource

40 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

The required positions of rainwater pipes on a new building can be identified in the

Building Plan with underground drainage systems details

Building Specification with building material specifications

Plumbing Specification with plumbing material specifications

Work Programme showing the different dwellings under construction

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Media Image

Which one of the following is a type of plastic gutter pattern?

Mansard

Half round angle connector

Half channel

Elsan

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

The maximum recommended length of a 40 mm waste discharge pipe from a bath connected to a Primary Ventilated Stack System is

3 metres

4 metres

5 metres

6 metres

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which one of the following soil stack components is used to connect a waste discharge pipe to a vertical stack, directly opposite the connection from another sanitary fitting?

Access pipe

Three way boss pipe

Cleaning eye tee

Parallel junction

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

A small amount of concrete pathway needs to be broken up in order to connect a newly installed soil pipe to the below ground drainage system. Which one of the following must be consulted before this is carried out?

The local Water Supplier

The customer

The local Building Control Officer

All other trades on the job

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which one of the following tools should be used to make a saddle branch connection to a main UPVC soil stack?

A drill and keyhole saw

A hole saw

A sharpened length of copper tube of the correct size

A heated length of copper tube of the correct size

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which one of the following is a requirement of the Primary Ventilated Stack System of above ground discharge pipework?

A maximum of any four sanitary appliances connected into the main stack.

A ventilating pipe from the lowest sanitary fitting connection.

Branch wastes to be as steep as possible and in any case not less than 20°.

A long radius bend at the foot of the main stack to minimise compression.

Create a free account and access millions of resources

Create resources
Host any resource
Get auto-graded reports
or continue with
Microsoft
Apple
Others
By signing up, you agree to our Terms of Service & Privacy Policy
Already have an account?