Phase 1 Central Heating checkpoint test

Phase 1 Central Heating checkpoint test

Professional Development

40 Qs

quiz-placeholder

Similar activities

Common Plumbing Processes 6035-02

Common Plumbing Processes 6035-02

Professional Development

37 Qs

Domestic Cold Water 6035-02 | Part 2

Domestic Cold Water 6035-02 | Part 2

Professional Development

40 Qs

EKG Review #1

EKG Review #1

Professional Development

40 Qs

Advance Hydraulic HD785-7

Advance Hydraulic HD785-7

Professional Development

45 Qs

TEST ONE

TEST ONE

Professional Development

41 Qs

Plumbing Level 2 - Central Heating

Plumbing Level 2 - Central Heating

12th Grade - Professional Development

41 Qs

Hot Water L2 6035

Hot Water L2 6035

Professional Development

43 Qs

Phase 1 Central Heating checkpoint test

Phase 1 Central Heating checkpoint test

Assessment

Quiz

Other

Professional Development

Medium

Created by

Ben Ashford

Used 16+ times

FREE Resource

40 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What heating system uses a difference in the density of water to circulate heat to a hot water cylinder?

Y plan

Gravity fed

S plan+

Hypocaust

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

The conservation of fuel and energy is covered by which approved document?

Building regulations part P

Building regulations part M

Building regulations part H

Building regulations part L

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the main purpose of a central heating system?

To heat up the core of the building

To provide thermal comfort to a property

To supply heating to a single room

To provide heat to a number of properties

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is at the highest point of a vented heating system?

Expansion vessel

Feed and expansion cistern

Cold feed isolation valve

Automatic air vent

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the primary function of the open vent on a central heating system?

To allow the system to pressurise

To allow the system to operate at atmospheric pressure

To provide sufficient oxygen to the heating system

To provide a means of ventilation when filling the system

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What type of heating system incorporates a three-port valve that gives priority to the hot water system?

S plan

S plan+

Y plan

W plan

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What three components are required when converting an open vented system with a sealed system?

Automatic air vent, low loss header, filling loop

Filling loop, expansion vessel, pressure gauge

Pressure relief valve, filling loop, expansion vessel

Expansion vessel, automatic air vent, pressure gauge

Create a free account and access millions of resources

Create resources
Host any resource
Get auto-graded reports
or continue with
Microsoft
Apple
Others
By signing up, you agree to our Terms of Service & Privacy Policy
Already have an account?