Floor systems

Floor systems

12th Grade

57 Qs

quiz-placeholder

Similar activities

beetlog

beetlog

1st Grade - University

62 Qs

Midterm Review 1-3

Midterm Review 1-3

9th - 12th Grade

55 Qs

Olimpiada - etap szkolny (01/2021)

Olimpiada - etap szkolny (01/2021)

11th - 12th Grade

60 Qs

Chapter 35 ABS Control Modules

Chapter 35 ABS Control Modules

11th - 12th Grade

59 Qs

SOAL UTBK KELAS PUS

SOAL UTBK KELAS PUS

12th Grade

60 Qs

Principals Exam (version 2)

Principals Exam (version 2)

12th Grade

60 Qs

Review 2

Review 2

11th Grade - Professional Development

54 Qs

The Henry Ford Quiz

The Henry Ford Quiz

12th Grade

52 Qs

Floor systems

Floor systems

Assessment

Quiz

Professional Development

12th Grade

Medium

Created by

James Reeves

Used 41+ times

FREE Resource

AI

Enhance your content

Add similar questions
Adjust reading levels
Convert to real-world scenario
Translate activity
More...

57 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

A structural column used to support other strucutural members, typically girders or beams.

Pillar
Foundation
Support beam

Pier

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Written document included with a set of prints that clarifies information presented on the prints and provides additional information not easily presented on the prints.

Specification Sheet
Information Sheet
Detail Sheet
Clarification Sheet

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

The direction of a door rotation

Up or down
Left or right

Swing

In or out

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which of the following would not be shown on a floor plan?

Interior walls

stairways

footings

window locations

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which of the following drawings show the location of floor openings for stairways?

foundation plan

floor plan

elevation plan

plot plan

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

When constructing wall panels for a platform-framed structure, the wall panels __

are built in position

are always placed using a crane

are all framed before the first panel is raised

are assembled on the subfloor

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

After raising a wall panel for a platform frame, the panel should first be fastened to the ____

top plate

foundation

ceiling joist

sub floor

Create a free account and access millions of resources

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

By signing up, you agree to our Terms of Service & Privacy Policy

Already have an account?