Station Power System Practice

Station Power System Practice

Professional Development

10 Qs

quiz-placeholder

Similar activities

Renewable Energy Quiz-NatGeo

Renewable Energy Quiz-NatGeo

Professional Development

10 Qs

Block 2 - 3A - Transformers

Block 2 - 3A - Transformers

Professional Development

15 Qs

Assessment: Work

Assessment: Work

Professional Development

10 Qs

PIPE Quiz for Bucharest Site

PIPE Quiz for Bucharest Site

Professional Development

15 Qs

Water Cycle Review Game

Water Cycle Review Game

KG - Professional Development

12 Qs

science quiz

science quiz

KG - Professional Development

10 Qs

Adrian's Science Quiz

Adrian's Science Quiz

Professional Development

10 Qs

Chapter 7-3: Coax & Connectors

Chapter 7-3: Coax & Connectors

Professional Development

13 Qs

Station Power System Practice

Station Power System Practice

Assessment

Quiz

Science

Professional Development

Medium

Created by

Jeff Weyhmiller

Used 2+ times

FREE Resource

10 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

When the 4160VAC and 2400VAC buses are being transferred between Station Power and Startup Power, the WHITE breaker status light above the associated breaker handswitch indicates which of the following?

Bus control power is available

Fast transfer is available

Undervoltage relays are reset

Charging springs are charged

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Load Center 13 (LCC-13) receives power from Bus __(1)__ and can supply alternate power to LCC-90 and LCC-91 in the event of a loss of power to Bus __(2)__.

(1) 1C

(2) 1E

(1) 1E

(2) 1A

(1) 1E

(2) 1D

(1) 1C

(2) 1A

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

The plant is at full power when a fault in the switchyard causes the 'F' Bus to deenergize. Which one of the following describes the effect of the 'F' Bus trip on the plant?

Both D/Gs start and load their respective buses. Bus 1E is deenergized

4160VAC and 2400VAC buses fast transfer to Startup Power

2400VAC busses 1C, 1D and 1E fast transfer to Startup Power

4160VAC and 2400VAC buses continue to be powered from Station Power

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which of the following combinations of LCCs below CANNOT be crosstied?

LCC-77 and LCC-78

LCC-11 and LCC-12

LCC-19 and LCC-20

LCC-13 and LCC-14

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

The plant is in MODE 3 at and being cooled down and depressurized to MODE 5. Which of the following groups of indications represents the FIRST SET of conditions where the plant has reached MODE 4?

PCS pressure = 475psia Tcolds = 302F, 301F, 300F, 299F

PCS Pressure = 550psia Tcolds = 399F, 398F, 397F, 399F

PCS Pressure = 390psia Tcolds = 297F, 299F, 300F, 299F

PCS Pressure = 400psia Tcolds = 298F, 299F, 296F, 299F

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which of the following would be considered a CORE ALTERATION?

The Upper Guide Structure is removed from the reactor with the refueling cavity flooded

The Part Length control rods are inserted all the way into the core after the reactor is tripped and prior to cooling down to MODE 5

A neutron source is removed from the core during refueling

The Transfer Car is used to move a new fuel assembly from the Spent Fuel Pool to the Reactor Cavity

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

The definition of a HEAVY LOAD is a load, _____(1)_____ a fuel assembly, that weighs more than _____(2)_____ pounds?

Not including, 1300

Including, 1300

Not including, 1800

Including, 1800

Create a free account and access millions of resources

Create resources
Host any resource
Get auto-graded reports
or continue with
Microsoft
Apple
Others
By signing up, you agree to our Terms of Service & Privacy Policy
Already have an account?