science revision 23/24

science revision 23/24

Professional Development

56 Qs

quiz-placeholder

Similar activities

Anatomy Basics

Anatomy Basics

Professional Development

60 Qs

Human Factors Midterm

Human Factors Midterm

Professional Development

59 Qs

level 2 electrical mock paper 2

level 2 electrical mock paper 2

Professional Development

60 Qs

FASA BULAN dan BURUJ

FASA BULAN dan BURUJ

1st Grade - Professional Development

52 Qs

IQ: AI THÔNG MINH HƠN HỌC SINH MẦM NON

IQ: AI THÔNG MINH HƠN HỌC SINH MẦM NON

1st Grade - Professional Development

62 Qs

Spring 21 PODA 2 Dr Mo Discussion Questions Final

Spring 21 PODA 2 Dr Mo Discussion Questions Final

University - Professional Development

56 Qs

ELK-opakovací test

ELK-opakovací test

Professional Development

57 Qs

Colour revision quiz 4

Colour revision quiz 4

Professional Development

54 Qs

science revision 23/24

science revision 23/24

Assessment

Passage

Science

Professional Development

Practice Problem

Medium

Created by

jon May

Used 2+ times

FREE Resource

56 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Why should a temporary earth bond be fitted before cutting into any metallic pipework?

To prevent water leakage

To maintain the earth continuity

To measure the pipe's diameter

To check the water pressure

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

How long should the clamps of a temporary earth bond be left in place?

Until the pipework is replaced

Until the pipework is tested for leaks

Until the permanent electrical continuity is re-established

Until the temporary earth bond is no longer needed

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What must all circuits and appliances be protected by according to modern regulations?

An RCD only

A fuse or MCB

A fuse or MCB and an RCD

Isolation switch

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Where is permanent de-commissioning done?

At the appliance

At the consumer unit

At the main switch

At the circuit breaker

5.

OPEN ENDED QUESTION

3 mins • 1 pt

What is required for every circuit and appliance for safety?

Evaluate responses using AI:

OFF

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Where can temporary de-commissioning be done?

At the consumer unit

At the main switch

At the appliance

At the circuit breaker

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What does the symbol with a straight line on top of a dashed line represent in electrical diagrams?

AC symbol

Ground connection

DC symbol for rectified current

DC symbol for battery

Create a free account and access millions of resources

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

By signing up, you agree to our Terms of Service & Privacy Policy

Already have an account?