
BASIC TECHNOLOGY YR7
Authored by Tosin Arogundade
Instructional Technology
7th Grade
Used 14+ times

AI Actions
Add similar questions
Adjust reading levels
Convert to real-world scenario
Translate activity
More...
Content View
Student View
15 questions
Show all answers
1.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
A block differs from a brick due to the
Presence of hole
Absence of hole
Presence of wood
Absence of cement
2.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
I. Measurement
II. Transportation
III. Mixing
Which of the activities above is not carried out with a head pan
A. I only
B. II only
C. III only
D. I, II and III
3.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
The banking hall is classified as
A. Corporate building
B. Residential building
C. Commercial building
D. School building
4.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
The type of building a man builds depends on _______ and ________
A. Population and security
B. Technology and wealth
C. Purpose and period
D. Country and bankk
5.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
In building construction, mechanical engineers fix the ___
A. Electrical conduits
B. Design the building
C. Roof the building
D. Plumbing works
6.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
The technical name for the method of laying block or brick is called ____
A. Plastering
B. Fencing
C. Masonry
D. Gravelly
7.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
The class of building that people live in for protection and safety is called ____
A. Religious building
B. Residential building
C. Cooperate building
D. Industrial building
Access all questions and much more by creating a free account
Create resources
Host any resource
Get auto-graded reports

Continue with Google

Continue with Email

Continue with Classlink

Continue with Clever
or continue with

Microsoft
%20(1).png)
Apple
Others
Already have an account?