JOC COSTING

JOC COSTING

University

10 Qs

quiz-placeholder

Similar activities

ECO120 CHAPTER 5

ECO120 CHAPTER 5

University

14 Qs

PNM U-PUSTAKA

PNM U-PUSTAKA

University

10 Qs

Blockchain Quiz 2

Blockchain Quiz 2

6th Grade - Professional Development

10 Qs

Living in the World of Semiconductor

Living in the World of Semiconductor

4th Grade - University

10 Qs

Educ 1B

Educ 1B

University

10 Qs

INTERNATIONAL FINANCE

INTERNATIONAL FINANCE

University

10 Qs

Motherly Maharashtra

Motherly Maharashtra

KG - University

13 Qs

Gender and Communication

Gender and Communication

University

10 Qs

JOC COSTING

JOC COSTING

Assessment

Quiz

Education

University

Practice Problem

Medium

Created by

laili ismail

Used 19+ times

FREE Resource

AI

Enhance your content in a minute

Add similar questions
Adjust reading levels
Convert to real-world scenario
Translate activity
More...

10 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is Job Order Costing?

A method of costing where work is undertaken to customer's specific requirements on the basis of orders

A method of costing where work is undertaken to customer's specific requirements on the basis of estimates

A method of costing where work is undertaken to customer's general requirements

A method of costing where work is undertaken without any specific requirements

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

How is unit cost computed in Job Order Costing?

By dividing the total job cost by the total number of jobs

By dividing the total job cost by the units produced on the job

By dividing the total job cost by the total direct material cost

By dividing the total job cost by the total direct labour cost

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the purpose of Predetermined Overhead Rate (POR)?

To calculate the total manufacturing overhead cost

To calculate the total direct material cost

To establish the relationship between estimated overhead cost and expected allocation base

To calculate the total direct labour cost

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the formula to calculate Predetermined Overhead Rate (POR)?

Total direct material cost/Total direct labour cost

Total job cost/Units produced on the job

Estimated overhead cost/Expected allocation base

Total manufacturing overhead cost/Total direct material cost

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

How is the output price determined in Job Order Costing?

By applying manufacturing overhead to the job

By calculating the Predetermined Overhead Rate (POR)

By dividing the total job cost by the units produced on the job

By calculating the total direct material cost

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the characteristic of products produced in Job Order Costing?

Produced based on company's internal needs

Produced without any specific requirements

Produced in large quantities

Produced based on customer order and specification

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

How is manufacturing overhead cost assigned in Job Order Costing?

By calculating Predetermined Overhead Rate (POR) and applying it to the job

By dividing the total job cost by the units produced on the job

By calculating the total direct material cost

By calculating the total direct labour cost

Create a free account and access millions of resources

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

Already have an account?