Search Header Logo

BSE Unit 5 Waste Management big Quiz

Authored by Miles Tarplee

Professional Development

12th Grade

Used 3+ times

BSE Unit 5 Waste Management big Quiz
AI

AI Actions

Add similar questions

Adjust reading levels

Convert to real-world scenario

Translate activity

More...

    Content View

    Student View

63 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What does the 'Prevention' stage in waste management include?

Landfill and incineration without energy recovery

Using less material in design and manufacture

Checking, cleaning, repairing, refurbishing, whole items or spare parts

Turning waste into a new substance or product

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is involved in the 'Preparing for re-use' stage of waste management?

Using less material in design and manufacture

Checking, cleaning, repairing, refurbishing, whole items or spare parts

Includes anaerobic digestion, incineration with energy recovery

Landfill and incineration without energy recovery

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which of the following is a part of the 'Recycling' stage of waste management?

Using less material in design and manufacture

Checking, cleaning, repairing, refurbishing, whole items or spare parts

Turning waste into a new substance or product

Landfill and incineration without energy recovery

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What does 'Other recovery' include in the context of waste management?

Using less material in design and manufacture

Checking, cleaning, repairing, refurbishing, whole items or spare parts

Includes anaerobic digestion, incineration with energy recovery, gasification and pyrolysis which produce energy (fuels, heat and power) and materials from waste; some backfilling

Landfill and incineration without energy recovery

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is considered 'Disposal' in waste management?

Turning waste into a new substance or product

Includes anaerobic digestion, incineration with energy recovery, gasification and pyrolysis which produce energy (fuels, heat and power) and materials from waste; some backfilling

Landfill and incineration without energy recovery

Using less material in design and manufacture

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the purpose of a Site Waste Management Plan (SWMP) in construction?

To monitor and control the budget of a construction project

To monitor and control the waste produced on a construction project

To monitor and control the construction project timeline

To monitor and control the number of workers on a construction project

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Who should work in conjunction with the principal contractor to produce a SWMP?

The local government

The construction workers

The client

The building services engineer

Access all questions and much more by creating a free account

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

Already have an account?