BSE Unit 5 Waste Management big Quiz

BSE Unit 5 Waste Management big Quiz

12th Grade

63 Qs

quiz-placeholder

Similar activities

Dental Assistant Mid-Term Dental Radiography

Dental Assistant Mid-Term Dental Radiography

11th - 12th Grade

65 Qs

Terrorism and Homeland Security Chapter 13

Terrorism and Homeland Security Chapter 13

11th - 12th Grade

64 Qs

Btech Yr12 POP Quiz

Btech Yr12 POP Quiz

12th Grade

60 Qs

Auto Tech Electrical

Auto Tech Electrical

11th - 12th Grade

67 Qs

BSE 12 Electrotechnical Circuits Quiz

BSE 12 Electrotechnical Circuits Quiz

12th Grade

60 Qs

LET 3 SEMESTER 1 REVIEW

LET 3 SEMESTER 1 REVIEW

9th - 12th Grade

66 Qs

BMF Unit 4 Review

BMF Unit 4 Review

8th - 12th Grade

59 Qs

CIS Microsoft Excel (Review)

CIS Microsoft Excel (Review)

9th Grade - Professional Development

62 Qs

BSE Unit 5 Waste Management big Quiz

BSE Unit 5 Waste Management big Quiz

Assessment

Quiz

Professional Development

12th Grade

Hard

Created by

Miles Tarplee

Used 3+ times

FREE Resource

63 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What does the 'Prevention' stage in waste management include?

Landfill and incineration without energy recovery

Using less material in design and manufacture

Checking, cleaning, repairing, refurbishing, whole items or spare parts

Turning waste into a new substance or product

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is involved in the 'Preparing for re-use' stage of waste management?

Using less material in design and manufacture

Checking, cleaning, repairing, refurbishing, whole items or spare parts

Includes anaerobic digestion, incineration with energy recovery

Landfill and incineration without energy recovery

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which of the following is a part of the 'Recycling' stage of waste management?

Using less material in design and manufacture

Checking, cleaning, repairing, refurbishing, whole items or spare parts

Turning waste into a new substance or product

Landfill and incineration without energy recovery

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What does 'Other recovery' include in the context of waste management?

Using less material in design and manufacture

Checking, cleaning, repairing, refurbishing, whole items or spare parts

Includes anaerobic digestion, incineration with energy recovery, gasification and pyrolysis which produce energy (fuels, heat and power) and materials from waste; some backfilling

Landfill and incineration without energy recovery

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is considered 'Disposal' in waste management?

Turning waste into a new substance or product

Includes anaerobic digestion, incineration with energy recovery, gasification and pyrolysis which produce energy (fuels, heat and power) and materials from waste; some backfilling

Landfill and incineration without energy recovery

Using less material in design and manufacture

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the purpose of a Site Waste Management Plan (SWMP) in construction?

To monitor and control the budget of a construction project

To monitor and control the waste produced on a construction project

To monitor and control the construction project timeline

To monitor and control the number of workers on a construction project

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Who should work in conjunction with the principal contractor to produce a SWMP?

The local government

The construction workers

The client

The building services engineer

Create a free account and access millions of resources

Create resources
Host any resource
Get auto-graded reports
or continue with
Microsoft
Apple
Others
By signing up, you agree to our Terms of Service & Privacy Policy
Already have an account?