What does the 'Prevention' stage in waste management include?
BSE Unit 5 Waste Management big Quiz

Quiz
•
Professional Development
•
12th Grade
•
Hard

Miles Tarplee
Used 3+ times
FREE Resource
63 questions
Show all answers
1.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
Landfill and incineration without energy recovery
Using less material in design and manufacture
Checking, cleaning, repairing, refurbishing, whole items or spare parts
Turning waste into a new substance or product
2.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
What is involved in the 'Preparing for re-use' stage of waste management?
Using less material in design and manufacture
Checking, cleaning, repairing, refurbishing, whole items or spare parts
Includes anaerobic digestion, incineration with energy recovery
Landfill and incineration without energy recovery
3.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
Which of the following is a part of the 'Recycling' stage of waste management?
Using less material in design and manufacture
Checking, cleaning, repairing, refurbishing, whole items or spare parts
Turning waste into a new substance or product
Landfill and incineration without energy recovery
4.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
What does 'Other recovery' include in the context of waste management?
Using less material in design and manufacture
Checking, cleaning, repairing, refurbishing, whole items or spare parts
Includes anaerobic digestion, incineration with energy recovery, gasification and pyrolysis which produce energy (fuels, heat and power) and materials from waste; some backfilling
Landfill and incineration without energy recovery
5.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
What is considered 'Disposal' in waste management?
Turning waste into a new substance or product
Includes anaerobic digestion, incineration with energy recovery, gasification and pyrolysis which produce energy (fuels, heat and power) and materials from waste; some backfilling
Landfill and incineration without energy recovery
Using less material in design and manufacture
6.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
What is the purpose of a Site Waste Management Plan (SWMP) in construction?
To monitor and control the budget of a construction project
To monitor and control the waste produced on a construction project
To monitor and control the construction project timeline
To monitor and control the number of workers on a construction project
7.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
Who should work in conjunction with the principal contractor to produce a SWMP?
The local government
The construction workers
The client
The building services engineer
Create a free account and access millions of resources
Similar Resources on Quizizz
58 questions
Beauty Industry Success

Quiz
•
12th Grade
59 questions
Workplace English Vocabulary Quiz

Quiz
•
KG - 12th Grade
62 questions
WCM Chapter 4

Quiz
•
12th Grade
59 questions
BSE UNIT8 Building Regulations Quiz

Quiz
•
12th Grade
60 questions
Working with Young Children Chapter 2

Quiz
•
12th Grade
62 questions
1.9. Entrepreneurship

Quiz
•
11th Grade - University
63 questions
Dog Handling Safety Quiz

Quiz
•
12th Grade - University
58 questions
Research on Air Conditioning in Buildings

Quiz
•
12th Grade
Popular Resources on Quizizz
15 questions
Character Analysis

Quiz
•
4th Grade
17 questions
Chapter 12 - Doing the Right Thing

Quiz
•
9th - 12th Grade
10 questions
American Flag

Quiz
•
1st - 2nd Grade
20 questions
Reading Comprehension

Quiz
•
5th Grade
30 questions
Linear Inequalities

Quiz
•
9th - 12th Grade
20 questions
Types of Credit

Quiz
•
9th - 12th Grade
18 questions
Full S.T.E.A.M. Ahead Summer Academy Pre-Test 24-25

Quiz
•
5th Grade
14 questions
Misplaced and Dangling Modifiers

Quiz
•
6th - 8th Grade