
BSE Unit 5 Waste Management big Quiz
Authored by Miles Tarplee
Professional Development
12th Grade
Used 3+ times

AI Actions
Add similar questions
Adjust reading levels
Convert to real-world scenario
Translate activity
More...
Content View
Student View
63 questions
Show all answers
1.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
What does the 'Prevention' stage in waste management include?
Landfill and incineration without energy recovery
Using less material in design and manufacture
Checking, cleaning, repairing, refurbishing, whole items or spare parts
Turning waste into a new substance or product
2.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
What is involved in the 'Preparing for re-use' stage of waste management?
Using less material in design and manufacture
Checking, cleaning, repairing, refurbishing, whole items or spare parts
Includes anaerobic digestion, incineration with energy recovery
Landfill and incineration without energy recovery
3.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
Which of the following is a part of the 'Recycling' stage of waste management?
Using less material in design and manufacture
Checking, cleaning, repairing, refurbishing, whole items or spare parts
Turning waste into a new substance or product
Landfill and incineration without energy recovery
4.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
What does 'Other recovery' include in the context of waste management?
Using less material in design and manufacture
Checking, cleaning, repairing, refurbishing, whole items or spare parts
Includes anaerobic digestion, incineration with energy recovery, gasification and pyrolysis which produce energy (fuels, heat and power) and materials from waste; some backfilling
Landfill and incineration without energy recovery
5.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
What is considered 'Disposal' in waste management?
Turning waste into a new substance or product
Includes anaerobic digestion, incineration with energy recovery, gasification and pyrolysis which produce energy (fuels, heat and power) and materials from waste; some backfilling
Landfill and incineration without energy recovery
Using less material in design and manufacture
6.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
What is the purpose of a Site Waste Management Plan (SWMP) in construction?
To monitor and control the budget of a construction project
To monitor and control the waste produced on a construction project
To monitor and control the construction project timeline
To monitor and control the number of workers on a construction project
7.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
Who should work in conjunction with the principal contractor to produce a SWMP?
The local government
The construction workers
The client
The building services engineer
Access all questions and much more by creating a free account
Create resources
Host any resource
Get auto-graded reports

Continue with Google

Continue with Email

Continue with Classlink

Continue with Clever
or continue with

Microsoft
%20(1).png)
Apple
Others
Already have an account?