BSE Unit 5 Waste Management big Quiz

Quiz
•
Professional Development
•
12th Grade
•
Hard

Miles Tarplee
Used 3+ times
FREE Resource
63 questions
Show all answers
1.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
What does the 'Prevention' stage in waste management include?
Landfill and incineration without energy recovery
Using less material in design and manufacture
Checking, cleaning, repairing, refurbishing, whole items or spare parts
Turning waste into a new substance or product
2.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
What is involved in the 'Preparing for re-use' stage of waste management?
Using less material in design and manufacture
Checking, cleaning, repairing, refurbishing, whole items or spare parts
Includes anaerobic digestion, incineration with energy recovery
Landfill and incineration without energy recovery
3.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
Which of the following is a part of the 'Recycling' stage of waste management?
Using less material in design and manufacture
Checking, cleaning, repairing, refurbishing, whole items or spare parts
Turning waste into a new substance or product
Landfill and incineration without energy recovery
4.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
What does 'Other recovery' include in the context of waste management?
Using less material in design and manufacture
Checking, cleaning, repairing, refurbishing, whole items or spare parts
Includes anaerobic digestion, incineration with energy recovery, gasification and pyrolysis which produce energy (fuels, heat and power) and materials from waste; some backfilling
Landfill and incineration without energy recovery
5.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
What is considered 'Disposal' in waste management?
Turning waste into a new substance or product
Includes anaerobic digestion, incineration with energy recovery, gasification and pyrolysis which produce energy (fuels, heat and power) and materials from waste; some backfilling
Landfill and incineration without energy recovery
Using less material in design and manufacture
6.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
What is the purpose of a Site Waste Management Plan (SWMP) in construction?
To monitor and control the budget of a construction project
To monitor and control the waste produced on a construction project
To monitor and control the construction project timeline
To monitor and control the number of workers on a construction project
7.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
Who should work in conjunction with the principal contractor to produce a SWMP?
The local government
The construction workers
The client
The building services engineer
Create a free account and access millions of resources
Similar Resources on Wayground
59 questions
Chapter 35 ABS Control Modules

Quiz
•
11th - 12th Grade
62 questions
beetlog

Quiz
•
1st Grade - University
66 questions
unit 12 lesson 10 Building Services Engineering (BSE) Quiz

Quiz
•
12th Grade
62 questions
Essay

Quiz
•
7th - 12th Grade
60 questions
Olimpiada - etap szkolny (01/2021)

Quiz
•
11th - 12th Grade
63 questions
Câu Hỏi Trắc Nghiệm Kỹ Thuật Ô Tô

Quiz
•
12th Grade
65 questions
Floral Certification Quiz

Quiz
•
9th - 12th Grade
63 questions
EFD Policy 409-501

Quiz
•
12th Grade
Popular Resources on Wayground
10 questions
Lab Safety Procedures and Guidelines

Interactive video
•
6th - 10th Grade
10 questions
Nouns, nouns, nouns

Quiz
•
3rd Grade
10 questions
9/11 Experience and Reflections

Interactive video
•
10th - 12th Grade
25 questions
Multiplication Facts

Quiz
•
5th Grade
11 questions
All about me

Quiz
•
Professional Development
22 questions
Adding Integers

Quiz
•
6th Grade
15 questions
Subtracting Integers

Quiz
•
7th Grade
9 questions
Tips & Tricks

Lesson
•
6th - 8th Grade