MGMT 339 Midterm 2

MGMT 339 Midterm 2

University

36 Qs

quiz-placeholder

Similar activities

SJFC Euro 2020 Quiz

SJFC Euro 2020 Quiz

KG - Professional Development

31 Qs

Soal latihan AM kls 9 semester Genap

Soal latihan AM kls 9 semester Genap

7th Grade - University

34 Qs

5to. Rojo 2Trim. SanFrancis

5to. Rojo 2Trim. SanFrancis

11th Grade - University

35 Qs

Chemia kl. 7 rozdział 1

Chemia kl. 7 rozdział 1

1st Grade - University

33 Qs

creative imedia

creative imedia

11th Grade - Professional Development

40 Qs

Ekonomi Mikro 2

Ekonomi Mikro 2

1st Grade - University

40 Qs

ภาษาอังกฤษ 17

ภาษาอังกฤษ 17

University

34 Qs

MGMT 339 Midterm 2

MGMT 339 Midterm 2

Assessment

Quiz

Other

University

Practice Problem

Easy

Created by

John K

Used 2+ times

FREE Resource

AI

Enhance your content in a minute

Add similar questions
Adjust reading levels
Convert to real-world scenario
Translate activity
More...

36 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which of the following would be a​ "common" cause of​ variation?


An untrained worker


A defective raw material


Random sources


A machine in need of repair


2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

A process failure that results in the​ process's inability to meet advertised performance standards violates which of the five definitions of​ quality?


conformance to specifications


fitness for use


psychological impressions


value

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

The ISO​ 14001:2004 standards require documentation of a​ firm's environmental program. Which component requires a plan to improve performance in resource use and pollutant​ output?


Environmental Labeling


​Life-Cycle Assessment


Environmental Performance Evaluation


Environmental Management System


4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

The proportion defective for​ 7-inch scissors had been measured at​ 5%. Samples of size 175 provided control limits of 0.00575 to 0.0994. After a certain process improvement was​ applied, samples began a trend toward the lower control limit with the third point recorded at 0.0049. What would be your recommended​ action?


Wait for at least two more points to establish if a run exists.


Ignore the points because the percent defective has been reduced.


Increase the sample size to counteract the negative drift.


Investigate the cause to determine if a process fix has been found.


5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

When considering the​ plan-do-check-act cycle for problem​ solving, instructing other employees in the use of the new process occurs in the​ ________ step.


do

act

check

plan

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

A​ firm's internal program in employee involvement includes which of the following​ considerations?


Supplier management


Psychological impressions


Product availability


Defining who the customer is


7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

The application of statistical techniques to determine whether a quantity of material should be accepted or rejected based on the inspection or test of a sample is known as


acceptance sampling.


the Deming Wheel.


benchmarking.


specification review.


Access all questions and much more by creating a free account

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

Already have an account?