Quiz #3 prep

Quiz #3 prep

University

50 Qs

quiz-placeholder

Similar activities

BUILDING TECHNOLOGY PT.2

BUILDING TECHNOLOGY PT.2

University

50 Qs

Structural NSCP Quiz

Structural NSCP Quiz

University

50 Qs

Self-Consolidating Concrete Testing Concepts

Self-Consolidating Concrete Testing Concepts

University

51 Qs

FOR PREPARTION

FOR PREPARTION

University

45 Qs

CMFO Statutes

CMFO Statutes

University

53 Qs

Research (Prelim)

Research (Prelim)

University

55 Qs

Facial Bones Scenarios

Facial Bones Scenarios

University

50 Qs

CDL Sec 11: Vehicle Inspection

CDL Sec 11: Vehicle Inspection

University

50 Qs

Quiz #3 prep

Quiz #3 prep

Assessment

Quiz

Other

University

Hard

Created by

Brian Unruh

Used 1+ times

FREE Resource

50 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

The office, organization, or individual responsible for enforcing the requirements of the code is called the ____________.

Advisory committee

Building official

Authority having jurisdiction

Board of appeals

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

The intent of the International Plumbing Code is to ____________.

Establish minimum standards

Provide a reasonable level of safety

Guard the public welfare

All of the above

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Where there is a conflict between a general requirement and a specific requirement, the most ____________ shall govern.

Expensive

Restrictive

Attainable

Ridiculous

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

According to the IPC, a required inspection shall take place ____________.

At the request of the permit holder

When the building official deems necessary

When the building inspector is in the area

At any time

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Every permit issued by the code official under the provisions of the IPC shall remain active for ____________ days.

365

270

180

90

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which of the following is NOT an example of a construction document?

Engineering calculations

Loan paperwork

Floor plan

Product specifications

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

The lowest piping of a drainage system that receives discharge from soil, waste, and other drain pipes within a building is called a __________.

Building drain

Building sewer

Building trap

Building vent

Create a free account and access millions of resources

Create resources
Host any resource
Get auto-graded reports
or continue with
Microsoft
Apple
Others
By signing up, you agree to our Terms of Service & Privacy Policy
Already have an account?