Quiz #3 prep

Quiz #3 prep

University

50 Qs

quiz-placeholder

Similar activities

Plastic Recycling Guide

Plastic Recycling Guide

10th Grade - Professional Development

50 Qs

NCM 109 SKILLS INVENTORY EXAM

NCM 109 SKILLS INVENTORY EXAM

University

50 Qs

Occ87 Place and finish non-specialist concrete

Occ87 Place and finish non-specialist concrete

KG - University

45 Qs

Philippine Electrical Code (Subject 4) - Nth

Philippine Electrical Code (Subject 4) - Nth

University

50 Qs

NBA

NBA

KG - Professional Development

47 Qs

Stats 5/11/21

Stats 5/11/21

7th Grade - University

52 Qs

EST 40

EST 40

University

50 Qs

Mobility/Client Education

Mobility/Client Education

11th Grade - University

50 Qs

Quiz #3 prep

Quiz #3 prep

Assessment

Quiz

Other

University

Hard

Created by

Brian Unruh

Used 1+ times

FREE Resource

50 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

The office, organization, or individual responsible for enforcing the requirements of the code is called the ____________.

Advisory committee

Building official

Authority having jurisdiction

Board of appeals

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

The intent of the International Plumbing Code is to ____________.

Establish minimum standards

Provide a reasonable level of safety

Guard the public welfare

All of the above

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Where there is a conflict between a general requirement and a specific requirement, the most ____________ shall govern.

Expensive

Restrictive

Attainable

Ridiculous

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

According to the IPC, a required inspection shall take place ____________.

At the request of the permit holder

When the building official deems necessary

When the building inspector is in the area

At any time

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Every permit issued by the code official under the provisions of the IPC shall remain active for ____________ days.

365

270

180

90

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which of the following is NOT an example of a construction document?

Engineering calculations

Loan paperwork

Floor plan

Product specifications

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

The lowest piping of a drainage system that receives discharge from soil, waste, and other drain pipes within a building is called a __________.

Building drain

Building sewer

Building trap

Building vent

Create a free account and access millions of resources

Create resources
Host any resource
Get auto-graded reports
or continue with
Microsoft
Apple
Others
By signing up, you agree to our Terms of Service & Privacy Policy
Already have an account?