Search Header Logo

Forklift Job Preparation

Authored by Kenia Macias

Professional Development

6th Grade

Used 4+ times

Forklift Job Preparation
AI

AI Actions

Add similar questions

Adjust reading levels

Convert to real-world scenario

Translate activity

More...

    Content View

    Student View

7 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

The most important things to do when getting ready for the job is to perform inspections of the:

PPE you plan to use.

Forklift you plan to use.

The workplace you plan to use the equipment in.

All the above.

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

You must do a pre-use inspection of your forklift:

At the start of the shift.

Before using it for the first time during a shift.

Whenever you notice something wrong.

Either a) or b) above.

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

A pre-use inspection should be conducted:

Near the maintenance shop so you can easily get any tools you might need.

Wherever you will be using the machine.

In an area that is safe and appropriate.

Wherever it can be done quickly.

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Class I, II or III hazardous locations are ones in which flammable, combustible or easily ignitable materials are present in the atmosphere.

True

False

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Special operations often require additional training and authorization in the use of specialized, task-specific work attachments.

True

False

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

You must communicate with the designated signal persons beforehand and make sure that:

They are a qualified forklift operator.

You know who their backup signal person is.

All signals to be used are discussed and understood.

All the above.

7.

MULTIPLE CHOICE QUESTION

15 mins • 1 pt

True or False: The 2022 CGP mandates that construction site operators must conduct inspections after significant rain events.

True

False

Answer explanation

The correct answer is True because the 2022 CGP mandates that construction site operators must conduct inspections after significant rain events.

Access all questions and much more by creating a free account

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

Already have an account?