Carpentry joist, flooring and balustrade planning Quiz

Authored by Miles Tarplee

Professional Development

12th Grade

Used 2+ times

Carpentry joist, flooring and balustrade planning Quiz
AI

AI Actions

Add similar questions

Adjust reading levels

Convert to real-world scenario

Translate activity

More...

    Content View

    Student View

49 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the first step in fitting spindles for a balustrade according to the instructions provided?

Measure the gap and divide by the number of spaces required.

Cut to length and dry fit all of the spindles tight against one newel post.

Apply adhesive to the spindles and set them in place.

Sand down the spindles to ensure a smooth finish.

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

When calculating the spacing for balustrade spindles, what should you do after dry fitting them against one newel post?

Paint the spindles before installation.

Measure the remaining gap and divide by the number of spaces required.

Secure the spindles with nails without measuring.

Install the handrail on top of the spindles.

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is indicated by the term "Joist span" in the diagram?

The length of the joist that is supported by the bearing wall.

The distance between the upper and lower fibers in tension.

The width of the joist.

The height of the joist.

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

According to the diagram, where are the fibers in tension located in a floor joist system?

At the top of the joist.

At the bottom of the joist.

Along the neutral axis.

On the sides of the joist.

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the first step in the sequence of work according to the provided material?

Setting out

Familiarising yourself with the task and the drawing

Cutting timbers to length

Laying floor joists

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which of the following is NOT a step listed in the sequence of work?

Laying flooring and hatch access panel

Installing electrical wiring

Cutting and fitting newel posts

Finishing and quality checks

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the step that directly follows 'Fixing floor joists' in the sequence of work?

Setting out hatch

Laying floor joists

Cutting timbers to length

Handrail and spindles

Access all questions and much more by creating a free account

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

Already have an account?

Discover more resources for Professional Development