Progression revision 6

Progression revision 6

Professional Development

34 Qs

quiz-placeholder

Similar activities

SALES CONTEST 2-FEB23

SALES CONTEST 2-FEB23

Professional Development

30 Qs

V27 SERIES ASSESSMENT

V27 SERIES ASSESSMENT

Professional Development

33 Qs

Sking Questions and info

Sking Questions and info

KG - Professional Development

29 Qs

Manajemen Pemerintah Daerah II (0526)

Manajemen Pemerintah Daerah II (0526)

Professional Development

30 Qs

Ulangan US PPKn Sem Genap 2020

Ulangan US PPKn Sem Genap 2020

Professional Development

30 Qs

Pokémon Galar

Pokémon Galar

KG - Professional Development

30 Qs

Redes de Computadores

Redes de Computadores

Professional Development

30 Qs

400th Prakash Purab of Guru Teg Bahadur Sahib Ji

400th Prakash Purab of Guru Teg Bahadur Sahib Ji

KG - Professional Development

30 Qs

Progression revision 6

Progression revision 6

Assessment

Quiz

Other

Professional Development

Medium

Created by

Plumbers Cymoedd

Used 20+ times

FREE Resource

34 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the minimum diameter of the hot water draw off pipe from a hot water cylinder?

A) 15mm

B) 22mm

C) 35mm

D) 28mm

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Media Image

What type of hot water cylinder is shown?

A) Combination

B) Unvented

C) Indirect

D) Direct

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Media Image

What type of cylinder is shown?

A) Combination

B) Unvented

C) Indirect

D) Direct

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Media Image

What type of cylinder is shown?

A) Combination

B) Unvented

C) Indirect

D) Direct

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

How should hot and cold pipework be installed to prevent undue warming of the cold water pipework?

Hot pipes above cold pipes

It makes no difference

Cold pipes above hot pipes

Hot and cold pipes installed in the same insulation

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What action can be taken to prevent noise from the expansion and contraction of copper pipework laid in traditional timber joists?

Wrap felt lagging around pipes where they lie in the joist

Wrap felt lagging around pipes between the joist

Install a 200mm length of plastic pipe 600mm along the length of copper pipe

Install plastic pipe every 600mm along the length of copper pipe

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

According to BS6700, how many minutes should a hot water system comprising of copper pipework be tested for?

90

60

30

120

Create a free account and access millions of resources

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

By signing up, you agree to our Terms of Service & Privacy Policy

Already have an account?