NCCER 02111 DWV 4.0 Quiz

NCCER 02111 DWV 4.0 Quiz

University

14 Qs

quiz-placeholder

Similar activities

vCTC Christmas in July

vCTC Christmas in July

KG - Professional Development

16 Qs

Quiz 02 Prelim LM 314

Quiz 02 Prelim LM 314

University

10 Qs

Факти про ЕС

Факти про ЕС

University - Professional Development

15 Qs

Got Apps?

Got Apps?

University

10 Qs

Revisão de Assistencia Farmacêutica 1

Revisão de Assistencia Farmacêutica 1

University

10 Qs

Violencia Sexual

Violencia Sexual

University

10 Qs

SWOT e BSC Fenômeno

SWOT e BSC Fenômeno

University

15 Qs

kepemanduan 1

kepemanduan 1

University

12 Qs

NCCER 02111 DWV 4.0 Quiz

NCCER 02111 DWV 4.0 Quiz

Assessment

Quiz

Professional Development

University

Practice Problem

Medium

Created by

Eugene L

Used 6+ times

FREE Resource

AI

Enhance your content in a minute

Add similar questions
Adjust reading levels
Convert to real-world scenario
Translate activity
More...

14 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

20 sec • 1 pt

Media Image

The height above an established reference point, such as a grade reference point on a construction drawing.

grade
plane
elevation
offset

2.

MULTIPLE CHOICE QUESTION

20 sec • 1 pt

When referring to DWV and especially sewer systems, the slope of a run of pipe is ____.

slope
grade
incline
tilt

3.

MULTIPLE CHOICE QUESTION

20 sec • 1 pt

Semi-liquid matter that settles out in a holding tank during the waste treatment process.

sliquid
scum
flurry
sludge

4.

MULTIPLE CHOICE QUESTION

20 sec • 1 pt

Technically, the speed and direction of a moving object. Commonly used in place of speed for describing the motion of fluids in pipes.

velocity
speed
friction
resistance

5.

MULTIPLE CHOICE QUESTION

20 sec • 1 pt

Minimum velocity required to keep solids suspended and from settling in pipe is ____.

4 feet per second
8 feet per second
2 feet per second
5 feet per second

6.

MULTIPLE CHOICE QUESTION

20 sec • 1 pt

The _______ is the main horizontal pipe inside a building. It carries all sewage and other liquid wastes to the building sewer.

public sewer
building waste
building sewer
building drain
smile waste

7.

MULTIPLE CHOICE QUESTION

20 sec • 1 pt

A ______ is the part of a drain pipe that extends laterally (sideways) from a soil or waste stack and receives the discharge from one or more fixture drains.

fixture branch
drain branch
horizontal branch
vertical branch

Create a free account and access millions of resources

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

By signing up, you agree to our Terms of Service & Privacy Policy

Already have an account?