A-186 [ENG] Wastewater Emergency Action (EHS-104-3)
Authored by Dolparin Wongchotthanawanich
Professional Development
University
Used 1+ times
![A-186 [ENG] Wastewater Emergency Action (EHS-104-3)](https://cf.quizizz.com/img/studentpreview.webp)
AI Actions
Add similar questions
Adjust reading levels
Convert to real-world scenario
Translate activity
More...
Content View
Student View
10 questions
Show all answers
1.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
According to the Wastewater emergency action plan (EHS-104-3), how many plans are there and what are they?
3 plans: environmental management, occupational health, and safety.
4 plans: abnormal wastewater treatment system, flood or fire, wastewater leak or broken main wastewater pipe, and power outage.
4 plans: fire, chemical spill, wastewater treatment system failure, and accident or quarrel.
None of all is correct.
2.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
According to the wastewater treatment system's abnormal plan, what are the duties of wastewater treatment system operators?
Submit a problem request in the E1 system.
Verify parameters with an in-house laboratory.
Shut down the system, stop pumping water into the chemical treatment system and wastewater valve, and closely monitor the water level in the EQ.
All answers are correct.
3.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
According to the wastewater treatment system, this is an abnormal plan. If employees find an abnormality, they can report it to who first?
Factory manager
Maintenance technician
Laboratory technician
Wastewater treatment system supervisor or manager
4.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
In the wastewater treatment system emergency plan: flood or fire Which is the thing? What can "general employees" do when such emergencies occur?
You can proceed as you see fit.
Work with maintenance technicians to cooperate and coordinate.
Coordinate with the safety department in implementing the fire emergency plan (EHS-022-1).
All answers are correct.
5.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
According to the wastewater treatment system's flood plan, which statement is correct regarding the wastewater treatment system supervisor or manager?
Contact and inquire with the Provincial Electricity Authority (PWA) to help urgently.
Call for maintenance service and/or order replacement parts.
Verify parameters with an in-house laboratory.
Contact and advise all sewerage users to reduce cleaning and flushing activities that occur.
6.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
According to the wastewater treatment system's wastewater leaks and main wastewater pipe breaks plan, which statement is correct regarding the wastewater treatment system operators?
Stop the production process immediately.
Contain as much leakage as possible.
Redirect leaks to high-risk areas.
All answers are correct.
7.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
According to the wastewater treatment system, there is a power outage. plan. If the Provincial Electricity Authority (PWA) informs us that the electricity supply must be stopped for more than how many hours? urgently contact the distributor of backup generators for rent.
6 hours
12 hours
18 hours
24 hours
Access all questions and much more by creating a free account
Create resources
Host any resource
Get auto-graded reports

Continue with Google

Continue with Email

Continue with Classlink

Continue with Clever
or continue with

Microsoft
%20(1).png)
Apple
Others
Already have an account?