Chapter 5: Inspection and Test

Chapter 5: Inspection and Test

Professional Development

8 Qs

quiz-placeholder

Similar activities

STG - E.coli & Nontyphoidal Samonella

STG - E.coli & Nontyphoidal Samonella

Professional Development

10 Qs

Knowledge Assessment for Chickenjoy

Knowledge Assessment for Chickenjoy

Professional Development

10 Qs

Seberapa tau kita tentang karang taruna

Seberapa tau kita tentang karang taruna

Professional Development

10 Qs

FILDIS - FINAL DEMO

FILDIS - FINAL DEMO

University - Professional Development

10 Qs

Economía Internacional_Actividad 2

Economía Internacional_Actividad 2

Professional Development

13 Qs

Child Safety Week - Kitchen Quiz

Child Safety Week - Kitchen Quiz

Professional Development

10 Qs

Evaluasi 1 SPPI Batch 3 Dodik Bela Negara

Evaluasi 1 SPPI Batch 3 Dodik Bela Negara

Professional Development

10 Qs

ENCUESTA EGRESADOS INSTRUMENTACIÓN QUIRÚRGICA

ENCUESTA EGRESADOS INSTRUMENTACIÓN QUIRÚRGICA

Professional Development

8 Qs

Chapter 5: Inspection and Test

Chapter 5: Inspection and Test

Assessment

Quiz

Other

Professional Development

Hard

Created by

Maria Fandiño

FREE Resource

8 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

This is the type of test where the system shall be plugged at its point of connection with public sewer or private sewage disposal and completely filling it with water from the lowest to highest point. Equivalent low pressure air test may also be done as an alternative.

Building Sewer Test

Water Piping Test

Air Test

Water Test

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Atleast how many working days before the inspection date should the advance notice be given?

1

2

3

4

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Drainage and vent system can be tested using water provided a ________.

3 meters head of water for 15 minutes

4 meters head of water for 15 minutes

19.62 kPa for 15 minutes

2 meters for 15 minutes

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Air test

34.5 kPa for at least 15 minutes

30.5 kPa for at least 15 minutes

33.5 kPa for at least 15 minutes

34.5 kPa for at least 10 minutes

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Water piping should be tested under a water pressure of __________.

100%

150%

200%

50%

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Water piping may be tested by air as a substitute for water test under _______.

344.5 kPa for 15 mins

325 kPa for 15 mins.

400 kPa for 15 mins.

34.5 kPa for 15 mins.

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Plumbing, drainage and vent system shall be tested with the use of water or air

media

true

covering or use

water test

8.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

No system shall be covered prior to approval of the admin.

media

true

covering or use

water test