Break Down Disconecting Switch GIS 150 Kv Tambak Lorok

Break Down Disconecting Switch GIS 150 Kv Tambak Lorok

Professional Development

10 Qs

quiz-placeholder

Similar activities

PM - Ch-5 (Cost Volume Profit analysis)

PM - Ch-5 (Cost Volume Profit analysis)

Professional Development

15 Qs

Inspired Friday Challenge

Inspired Friday Challenge

Professional Development

10 Qs

[ENGLISH Super Star] Week 1: Automotive

[ENGLISH Super Star] Week 1: Automotive

Professional Development

12 Qs

STAAR Testing Time- TAs

STAAR Testing Time- TAs

Professional Development

13 Qs

About me

About me

4th Grade - Professional Development

15 Qs

BCSI AWARENESS

BCSI AWARENESS

KG - Professional Development

15 Qs

Canciones de los 80

Canciones de los 80

Professional Development

10 Qs

Daily Check-In-5

Daily Check-In-5

KG - Professional Development

8 Qs

Break Down Disconecting Switch GIS 150 Kv Tambak Lorok

Break Down Disconecting Switch GIS 150 Kv Tambak Lorok

Assessment

Quiz

Other

Professional Development

Practice Problem

Medium

Created by

Vcon Upmk1

Used 5+ times

FREE Resource

AI

Enhance your content in a minute

Add similar questions
Adjust reading levels
Convert to real-world scenario
Translate activity
More...

10 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Apa judul Knowledge Sharing (KS) yang dipaparkan Pak Imam Ghozali?

A. Study Kasus : Break Dance Disconecting Switch GIS 150 kV Cangkring Baru

B. Study Kasus : Break Down Disconecting Switch GIS 150 kV Cangkring Baru

C. Study Kasus : Break Down Disconecting Switch GIS 150 kV Tambak Lorok

D. Study Kasus : Break Dance Disconecting Switch GIS 150 kV Tambak Lorok

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Peralatan apa yg mengalami break down di GIS Tambak Lorok?

A. Disconecting Switch (DS)

B. Distributed Control System (DCS)

C. Disconecting Swift (DS)

D. Disable Switch (DS)

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Apa penyebab break down DS di GIS Tambak Lorok?

A. Pada saat hujan terjadi gangguan pada CB

B. Pada saat proses close ada perintah CB close

C. A, B dan D salah

D. Pada saat proses open ada perintah CB close

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Berapa lama waktu open DS di GIS Tambak Lorok?

A. 1 jam saja

B. Di bawah 1.5 s

C. Di atas 1.5 s

D. Unlimited

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Pada diameter berapa posisi DS yang mengalami break down di GIS Tambak Lorok?

A. Diameter 1 - cut off AB

B. Diameter 1 - cut off BC

C. Diameter 2 - cut off AB

D. Diameter 2 - cut off BC

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Apa kepanjangan dari SCADA?

A. Supervision Control And Data Aquisition

B. Supervisory Control And Data Administration

C. Supervisory Control And Design Aquisition

D. Supervisory Control And Data Aquisition

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Pada jam berapa terjadi kasus break dowm DS di GIS Tambak Lorok?

A. 01.01.01

B. 03.04.05

C. 12.34.56

D. 09.14.46

Create a free account and access millions of resources

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

Already have an account?