2.1.2 Processing Time Quiz

2.1.2 Processing Time Quiz

12th Grade

15 Qs

quiz-placeholder

Similar activities

 Maintaining Technological Products and Systems (ITEEA 12)

Maintaining Technological Products and Systems (ITEEA 12)

9th - 12th Grade

16 Qs

TSFA Study Guide (1-20)

TSFA Study Guide (1-20)

9th - 12th Grade

20 Qs

2.1.4 Process Lead Time Quiz

2.1.4 Process Lead Time Quiz

12th Grade

15 Qs

Understanding Injection Moulding

Understanding Injection Moulding

12th Grade

10 Qs

4.5 Product

4.5 Product

11th - 12th Grade

20 Qs

Manufacturing Pathways Quiz

Manufacturing Pathways Quiz

7th - 12th Grade

12 Qs

MANUAL MILL SETUP

MANUAL MILL SETUP

12th Grade

20 Qs

Accounting Chapter 10

Accounting Chapter 10

9th - 12th Grade

20 Qs

2.1.2 Processing Time Quiz

2.1.2 Processing Time Quiz

Assessment

Quiz

Specialty

12th Grade

Hard

Created by

Nurhana Juraimi

FREE Resource

15 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is Processing Time?

Time a product is being worked on by an operator

Time a product is being designed by engineers

Time a product is being shipped to customers

Time a product is being stored in inventory

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is included in Process Time?

Approval Time + Production Time

Machine Time + Operator Time

Manual Work + Walking + Waiting

Sales Time + Engineering Time

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is not included in Processing Time?

Engineering Time

Sales Time

Operator Time

Machine Time

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is Wait Time?

Time spent waiting for the machine to finish work

Time spent walking around the facility

Time spent doing manual work

Time spent in sales order processing

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is Operator Cycle Time?

Time performed by the Production Department

Time spent in sales order processing

Time spent in engineering

Time spent in approval cycles

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What does Processing Time include?

Think time and touch time

Machine time and operator time

Sales time and engineering time

Approval time and production time

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is Machine Time?

Not included in Processing Time

Included in Processing Time

Not relevant to Processing Time

Included in Operator Cycle Time

Create a free account and access millions of resources

Create resources
Host any resource
Get auto-graded reports
or continue with
Microsoft
Apple
Others
By signing up, you agree to our Terms of Service & Privacy Policy
Already have an account?