Inspection and Test Revision Paper 2A

Inspection and Test Revision Paper 2A

Professional Development

30 Qs

quiz-placeholder

Similar activities

Chapter 9: Nail Structure & Growth

Chapter 9: Nail Structure & Growth

9th Grade - Professional Development

25 Qs

Physio Quizz 2024

Physio Quizz 2024

Professional Development

25 Qs

BELUX Salesforce Days

BELUX Salesforce Days

Professional Development

25 Qs

wonders spelling test 5.1

wonders spelling test 5.1

Professional Development

25 Qs

Recap

Recap

Professional Development

25 Qs

Wine O'Clock Intro

Wine O'Clock Intro

Professional Development

25 Qs

ICCMR Orientation Quiz

ICCMR Orientation Quiz

Professional Development

25 Qs

Foundations of Programming

Foundations of Programming

Professional Development

25 Qs

Inspection and Test Revision Paper 2A

Inspection and Test Revision Paper 2A

Assessment

Quiz

Other

Professional Development

Practice Problem

Hard

Created by

Amir Karbassi

Used 2+ times

FREE Resource

AI

Enhance your content in a minute

Add similar questions
Adjust reading levels
Convert to real-world scenario
Translate activity
More...

30 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

On completion of a new installation, the interval before the first periodic inspection would be decided by:

installer

installation designer

client

inspection and testing engineer.

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Any addition to an existing installation should:

have a similar wiring system to that used in the existing installation

be inspected and tested separate from the existing installation

not impair the safety of the existing installation

have its own energy meter separate from that of the existing installation.

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which of the following duties is 'not' the responsibility of the inspector:

to carry out maintenance and repairs on the installation

to compare the test results with the design criteria

to advise on remedial works

to recommend the immediate isolation of defective parts.

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Inspection of a fully enclosed domestic consumer unit would not need verification for:

identification of conductors

rating and type of protective devices

IP rating

correct connection of single-pole devices.

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

When inspecting for adequate 'basic protection' (protection against electric shock or direct contact) which of the following does not require inspection. Presence and condition of:

insulation

enclosures

barriers

cpc's.

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

The measured value of loop impedance for a circuit is 2.4Ω. If the temperature at the time of the test was 20°C and the cable is 70°C (factor 1.2) what is the corrected value. Ze = 0.4Ω:

2.88 Ω

2.8 Ω

2.4 Ω

2.0 Ω.

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Put the following tests in the correct sequence: 1- earth fault loop impedance 2- polarity 3- ring circuit continuity 4- prospective fault current:

1,3,2,4

2,4,1,3

1,4,3,2

4,1,2,3

Create a free account and access millions of resources

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

Already have an account?