
4.1 Kanban Quiz
Authored by Nurhana Juraimi
Specialty
12th Grade

AI Actions
Add similar questions
Adjust reading levels
Convert to real-world scenario
Translate activity
More...
Content View
Student View
15 questions
Show all answers
1.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
What is the first rule of Kanban?
A Kanban signal is only issued when the component it represents is used.
No Kanban no part (i.e. components are only made or issued when a Kanban exists).
No over production.
Only good components are issued.
2.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
When does production begin in the Kanban system?
When a material handler with a move card removes a standard container of parts from outbound stock point.
When all three are available - production card, container of the appropriate incoming parts, an idle work station.
When over production occurs.
When a Kanban signal is issued.
3.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
What is the classic version of Kanban called?
Two card kanban system
Three card kanban system
Multiple card kanban system
Single card kanban system
4.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
What is the purpose of the move card in Kanban?
Reduces the number of Kanban cards over time.
Ensures over production does not occur.
Indicates the number of parts needed for production.
Authorizes the handler to take parts and tells where they are needed.
5.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
What happens before production begins in the Kanban system?
The move card is placed in the hopper for move cards at the work station.
The worker processes the parts.
The material handler collects the move card(s).
The production card is removed from the standard container and placed on the production card board.
6.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
What should be tackled as the number of Kanban cards is reduced over time?
The problems encountered
The number of work stations
The production rate
The number of components manufactured
7.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
What is the second rule of Kanban?
No over production.
Only good components are issued.
A Kanban signal is only issued when the component it represents is used.
No Kanban no part (i.e. components are only made or issued when a Kanban exists).
Access all questions and much more by creating a free account
Create resources
Host any resource
Get auto-graded reports

Continue with Google

Continue with Email

Continue with Classlink

Continue with Clever
or continue with

Microsoft
%20(1).png)
Apple
Others
Already have an account?
Similar Resources on Wayground
20 questions
Sports Medicine
Quiz
•
10th - 12th Grade
12 questions
Audio Video Basics Review 2
Quiz
•
10th - 12th Grade
15 questions
Foods 1.01 & 1.02 Quiz Review
Quiz
•
9th - 12th Grade
15 questions
CH4 Safety and Infection Control
Quiz
•
10th - 12th Grade
17 questions
Hand and Power Tools - Drill Press, and more
Quiz
•
9th - 12th Grade
10 questions
Tools in Inferential Statistics
Quiz
•
9th - 12th Grade
10 questions
Sadako
Quiz
•
9th - 12th Grade
12 questions
Irish dance
Quiz
•
KG - Professional Dev...
Popular Resources on Wayground
15 questions
Fractions on a Number Line
Quiz
•
3rd Grade
10 questions
Probability Practice
Quiz
•
4th Grade
15 questions
Probability on Number LIne
Quiz
•
4th Grade
20 questions
Equivalent Fractions
Quiz
•
3rd Grade
25 questions
Multiplication Facts
Quiz
•
5th Grade
22 questions
fractions
Quiz
•
3rd Grade
6 questions
Appropriate Chromebook Usage
Lesson
•
7th Grade
10 questions
Greek Bases tele and phon
Quiz
•
6th - 8th Grade
Discover more resources for Specialty
15 questions
Making Inferences
Quiz
•
7th - 12th Grade
23 questions
TSI Math Vocabulary
Quiz
•
10th - 12th Grade
20 questions
-AR -ER -IR present tense
Quiz
•
10th - 12th Grade
20 questions
SSS/SAS
Quiz
•
9th - 12th Grade
20 questions
Predicting Products
Quiz
•
9th - 12th Grade
20 questions
Presidents Day challenge
Quiz
•
9th - 12th Grade
20 questions
Food Chains and Food Webs
Quiz
•
7th - 12th Grade
20 questions
Banking
Quiz
•
9th - 12th Grade