1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the first rule of Kanban?

A Kanban signal is only issued when the component it represents is used.

No Kanban no part (i.e. components are only made or issued when a Kanban exists).

No over production.

Only good components are issued.

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

When does production begin in the Kanban system?

When a material handler with a move card removes a standard container of parts from outbound stock point.

When all three are available - production card, container of the appropriate incoming parts, an idle work station.

When over production occurs.

When a Kanban signal is issued.

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the classic version of Kanban called?

Two card kanban system

Three card kanban system

Multiple card kanban system

Single card kanban system

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the purpose of the move card in Kanban?

Reduces the number of Kanban cards over time.

Ensures over production does not occur.

Indicates the number of parts needed for production.

Authorizes the handler to take parts and tells where they are needed.

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What happens before production begins in the Kanban system?

The move card is placed in the hopper for move cards at the work station.

The worker processes the parts.

The material handler collects the move card(s).

The production card is removed from the standard container and placed on the production card board.

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What should be tackled as the number of Kanban cards is reduced over time?

The problems encountered

The number of work stations

The production rate

The number of components manufactured

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the second rule of Kanban?

No over production.

Only good components are issued.

A Kanban signal is only issued when the component it represents is used.

No Kanban no part (i.e. components are only made or issued when a Kanban exists).

Access all questions and much more by creating a free account

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

Already have an account?