4.1 Kanban Quiz

4.1 Kanban Quiz

12th Grade

15 Qs

quiz-placeholder

Similar activities

PLTW - IED - Reverse Engineering and the 3 Analyses

PLTW - IED - Reverse Engineering and the 3 Analyses

9th - 12th Grade

20 Qs

Factors of Production

Factors of Production

9th - 12th Grade

10 Qs

ADM Unit 1

ADM Unit 1

10th - 12th Grade

15 Qs

10L2 Cardiovascular System: Blood Typing

10L2 Cardiovascular System: Blood Typing

10th - 12th Grade

12 Qs

PBS 1.1.4. ABO Blood Typing

PBS 1.1.4. ABO Blood Typing

9th - 12th Grade

20 Qs

Kanban Board Quiz

Kanban Board Quiz

12th Grade

16 Qs

Product Life Cycle

Product Life Cycle

10th - 12th Grade

20 Qs

Credit and Debit Cards

Credit and Debit Cards

8th - 12th Grade

10 Qs

4.1 Kanban Quiz

4.1 Kanban Quiz

Assessment

Quiz

Specialty

12th Grade

Hard

Created by

Nurhana Juraimi

FREE Resource

15 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the first rule of Kanban?

A Kanban signal is only issued when the component it represents is used.

No Kanban no part (i.e. components are only made or issued when a Kanban exists).

No over production.

Only good components are issued.

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

When does production begin in the Kanban system?

When a material handler with a move card removes a standard container of parts from outbound stock point.

When all three are available - production card, container of the appropriate incoming parts, an idle work station.

When over production occurs.

When a Kanban signal is issued.

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the classic version of Kanban called?

Two card kanban system

Three card kanban system

Multiple card kanban system

Single card kanban system

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the purpose of the move card in Kanban?

Reduces the number of Kanban cards over time.

Ensures over production does not occur.

Indicates the number of parts needed for production.

Authorizes the handler to take parts and tells where they are needed.

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What happens before production begins in the Kanban system?

The move card is placed in the hopper for move cards at the work station.

The worker processes the parts.

The material handler collects the move card(s).

The production card is removed from the standard container and placed on the production card board.

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What should be tackled as the number of Kanban cards is reduced over time?

The problems encountered

The number of work stations

The production rate

The number of components manufactured

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the second rule of Kanban?

No over production.

Only good components are issued.

A Kanban signal is only issued when the component it represents is used.

No Kanban no part (i.e. components are only made or issued when a Kanban exists).

Create a free account and access millions of resources

Create resources
Host any resource
Get auto-graded reports
or continue with
Microsoft
Apple
Others
By signing up, you agree to our Terms of Service & Privacy Policy
Already have an account?