
4.1.4 Quiz on KANBAN System
Authored by Nurhana Juraimi
Specialty
12th Grade

AI Actions
Add similar questions
Adjust reading levels
Convert to real-world scenario
Translate activity
More...
Content View
Student View
5 questions
Show all answers
1.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
What does Withdrawal Kanban specify?
Kind and quantity of product to withdraw from a preceding process
Kind and quantity of product to produce
Kind and quantity of product to discard
Kind and quantity of product to store
2.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
In a Single Card Kanban System, what does the operator require to begin processing?
Production Card and Material
Withdrawal Kanban and Material
Production-ordering Kanban and Material
Move Card and Production Card
3.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
When is a Two Card Kanban used?
When there is no need for an Inbound Stock Point
When WIP can be effectively handed from one process to the next
When there is low complexity parts
When there is no need for an Outbound Stock Point
4.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
What is an advantage of the KANBAN system over the traditional push system?
High fixed stock
Long lead time
Overproduction
Visible quality problem
5.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
What does the KANBAN system help in minimizing?
Quality problems
Wastes
Over capacity in processes
Lead time
Access all questions and much more by creating a free account
Create resources
Host any resource
Get auto-graded reports

Continue with Google

Continue with Email

Continue with Classlink

Continue with Clever
or continue with

Microsoft
%20(1).png)
Apple
Others
Already have an account?