Search Header Logo

01 Push vs Pull System Quiz

Authored by Nurhana Juraimi

Specialty

12th Grade

01 Push vs Pull System Quiz
AI

AI Actions

Add similar questions

Adjust reading levels

Convert to real-world scenario

Translate activity

More...

    Content View

    Student View

7 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which system assumes all work will take as long as allowed with no defective parts ever built?

Push System

Pull System

Hybrid System

Lean System

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

In which system does the receiving workstation not accept any defective parts?

Push System

Lean System

Pull System

Hybrid System

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is a main identifier of pull systems in production cycles?

Total Quality Management

Just-in-Time inventory

KANBAN methods

Six Sigma principles

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which system creates only the parts requested from a downstream workstation?

Lean System

Pull System

Push System

Hybrid System

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the aim of having a visual aid like KANBAN in pull systems?

To increase lead times

To reduce costs

To confuse workers

To slow down production

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

In which system does everyone's work get triggered by required start dates?

Push System

Pull System

Hybrid System

Lean System

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which system is based on customer demand and aims to reduce stock levels?

Push System

Lean System

Pull System

Hybrid System

Access all questions and much more by creating a free account

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

Already have an account?