27111 #1 Wall Systems

27111 #1 Wall Systems

9th Grade

50 Qs

quiz-placeholder

Similar activities

Plant Parts

Plant Parts

9th - 12th Grade

48 Qs

Principles Final Exam

Principles Final Exam

9th Grade

45 Qs

Chapter 2 Quiz

Chapter 2 Quiz

9th - 12th Grade

50 Qs

Chapter 21:  Haircoloring

Chapter 21: Haircoloring

9th - 12th Grade

50 Qs

Transportation, Distribution & Logistics Career Cluster

Transportation, Distribution & Logistics Career Cluster

6th - 12th Grade

50 Qs

FOOD AND BEVERAGE DAILY TEST 1

FOOD AND BEVERAGE DAILY TEST 1

9th - 12th Grade

50 Qs

Textiles

Textiles

9th - 12th Grade

50 Qs

NJ Drivers Education Chapter 1a + Road Sign Review

NJ Drivers Education Chapter 1a + Road Sign Review

9th - 12th Grade

49 Qs

27111 #1 Wall Systems

27111 #1 Wall Systems

Assessment

Quiz

Specialty

9th Grade

Medium

Created by

Christopher Foy

Used 1+ times

FREE Resource

AI

Enhance your content

Add similar questions
Adjust reading levels
Convert to real-world scenario
Translate activity
More...

50 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is one of the objectives of the session regarding wall systems?

Identify the components of a wall system.

Identify the types of roofing materials.

Describe the process of painting walls.

Explain the purpose of flooring.

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which method should be identified to construct corner posts?

Methods used to construct corner posts.

Methods used to paint walls.

Methods used to install windows.

Methods used to lay flooring.

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What should be described about partition intersections?

How to frame partition intersections.

How to paint partition intersections.

How to install partition intersections.

How to remove partition intersections.

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the purpose of headers that needs to be explained?

The purpose of headers and how they are constructed.

The purpose of headers and how they are painted.

The purpose of headers and how they are removed.

The purpose of headers and how they are installed.

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What should be described about metal-framed walls?

How metal-framed walls are constructed.

How metal-framed walls are painted.

How metal-framed walls are removed.

How metal-framed walls are installed.

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Media Image

What is the name of the horizontal framing member located at the bottom of a wall assembly?

Top Plate

Header

Soleplate

King Stud

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Media Image

Which framing member is located directly above the rough opening for a window or door?

Cripple Stud

Header

Trimmer Stud

Common Stud

Create a free account and access millions of resources

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

By signing up, you agree to our Terms of Service & Privacy Policy

Already have an account?