Plumbing level 2 - PP5 - Cold water

Plumbing level 2 - PP5 - Cold water

University

10 Qs

quiz-placeholder

Similar activities

PRETEST-2 BPJ

PRETEST-2 BPJ

University

15 Qs

Engine Management L1 - Day 1

Engine Management L1 - Day 1

University

10 Qs

Plumbing level 2 - PP3 - Drainage

Plumbing level 2 - PP3 - Drainage

University

10 Qs

Plumbing level 2 - PP6 -  Cold water

Plumbing level 2 - PP6 - Cold water

University

10 Qs

Low Pressure Fuel Systems

Low Pressure Fuel Systems

University

10 Qs

Principles of Heating and Air Conditioning

Principles of Heating and Air Conditioning

8th Grade - University

10 Qs

Plumbing level 2 - PP2.2 - Drainage

Plumbing level 2 - PP2.2 - Drainage

University

10 Qs

Plumbing level 2 - PP6 - Hot water

Plumbing level 2 - PP6 - Hot water

University

10 Qs

Plumbing level 2 - PP5 - Cold water

Plumbing level 2 - PP5 - Cold water

Assessment

Quiz

Professional Development

University

Medium

Created by

Byron Morris

Used 50+ times

FREE Resource

10 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the first step in soundness testing for rigid pipes?

Attach the hydraulic test bucket

Pump system up to 1.5 x working pressure

Slowly fill the system with water

Leave for one hour

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What should be done after filling the system with water during soundness testing for plastic pipes?

Pump system to 1bar

Leave for 30 minutes

Check for pressure loss

Walk around the system and check for leaks

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the purpose of adding disinfectant to the system?

To increase water pressure

To stabilize temperature

To clean the system chemically

To check for leaks

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What should be done if there is a pressure drop during soundness testing of rigid pipes?

Increase the pressure

Rectify and re-test

Leave for another hour

Attach the hydraulic test bucket

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the correct pressure to pump the system to during Test A for plastic pipes?

1.5 x working pressure

Manufacturer’s test pressure

1bar

2bar

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the final step in commissioning a plumbing system?

Adjust FOV levels in CWSC and WCs

Complete any documentation

Test flow rates at outlets

Inspect insulation or pipework

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is a passive dead leg?

A section of pipework that is isolated for a period of time

A section of pipework that is actively used

A section of pipework through which water cannot be drawn off or flow

A section of pipework through which cold water has to be drawn off before hot water

Create a free account and access millions of resources

Create resources
Host any resource
Get auto-graded reports
or continue with
Microsoft
Apple
Others
By signing up, you agree to our Terms of Service & Privacy Policy
Already have an account?