1.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
A control plan contains (select the best answer)
control methods to be used
data to be collected
steps to be taken if problems are detected.
All of the above
2.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
A graphic representation of possible causes for any particular problem under study is also referred to as:
Fishbone diagram
FMEA
Hypothesis testing
None of the above
3.
FILL IN THE BLANKS QUESTION
30 sec • 1 pt
A (a) is a collection of steps, tasks or activities that are performed, usually in a specific order and result in an end product such as goods, service or improvement.
4.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
Six Sigma is:
A Six Sigma Project
A Six Sigma Methodology
A Process
A Goal
5.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
All the following are objectives of Analysis phase Except:
Doing analysis of present system
Analyzing whether the present system can be further improved
Determining major milestones and risks in successfully completing the project
Creating run charts
6.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
All the following are tools for six sigma control phase EXCEPT
Control Plan
Statistical process control
Lessons Learned
Kanban
7.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
All the following are tools to Analysis phase EXCEPT?
Special and Common cause of variation
Ishikawa diagrams
Hypothesis testing
FMEA
Access all questions and much more by creating a free account
Create resources
Host any resource
Get auto-graded reports

Continue with Google

Continue with Email

Continue with Classlink

Continue with Clever
or continue with

Microsoft
%20(1).png)
Apple
Others
Already have an account?