Estimation

Estimation

University

10 Qs

quiz-placeholder

Similar activities

UPM Engineering Fair

UPM Engineering Fair

University

9 Qs

Technical Specifications

Technical Specifications

University

10 Qs

Construction Documents & Drawings

Construction Documents & Drawings

9th Grade - University

15 Qs

IT Project Failure Research Quiz

IT Project Failure Research Quiz

University

10 Qs

RESOURCE SCHEDULING

RESOURCE SCHEDULING

University

12 Qs

Project Management (Asynchronous class, Week 3, 4 and 14)

Project Management (Asynchronous class, Week 3, 4 and 14)

University

6 Qs

Monroe Critical Thinking Preparation

Monroe Critical Thinking Preparation

KG - University

11 Qs

Quiz 1 - Project Management 17-nov-2023

Quiz 1 - Project Management 17-nov-2023

University

15 Qs

Estimation

Estimation

Assessment

Quiz

Other

University

Medium

Created by

Aidatul Jamaluddin

Used 1+ times

FREE Resource

10 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Type of estimation except

apprropriate estimation

approximate estimation

detailes estimation

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

During initial stage there are three parties involved except ......

Engineer

Architect

Client

Quantity Surveyor

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

In initial stage, the estimation will help

Owner of the project can be able to know whether the project can be undertaken within the available budget

Owner to choose the next location for new project

Owner to hire a new project manager

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

The person that will design and prepare the detailed drawing are

Quatity surveyor and architect

Architect and contractor

Architect and engineer

Engineer and contractor

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

In construction stage, contractor will prepare the

As built drawing

Sketch desgin

Architecture drawing

Structure drawing

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

In pyramid cost model, the unit used during brief stage are

unit and space

element and features

unit and element

space and features

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Following are function of estimation except

Guide the decision making among two or there possible options

Identifying early cost from the decision making

Guideline to the designer during selecting material and size the project to fall within the owner budget

Contractor to figure their dream car

Create a free account and access millions of resources

Create resources
Host any resource
Get auto-graded reports
or continue with
Microsoft
Apple
Others
By signing up, you agree to our Terms of Service & Privacy Policy
Already have an account?