Estimation

Estimation

University

10 Qs

quiz-placeholder

Similar activities

GKA2043 Quiz 1

GKA2043 Quiz 1

University

10 Qs

PROFITABILITY RATIOS & MARKET TESTS

PROFITABILITY RATIOS & MARKET TESTS

University

10 Qs

Training External

Training External

University

15 Qs

PIPING TECHNIQUES

PIPING TECHNIQUES

9th Grade - University

10 Qs

Session 3

Session 3

University

13 Qs

Chayamana Quiz Competition

Chayamana Quiz Competition

1st Grade - University

15 Qs

Defense Expo Quiz

Defense Expo Quiz

University

10 Qs

Macro Economics 19.1 - 19.2

Macro Economics 19.1 - 19.2

University

14 Qs

Estimation

Estimation

Assessment

Quiz

Other

University

Practice Problem

Medium

Created by

Aidatul Jamaluddin

Used 1+ times

FREE Resource

AI

Enhance your content in a minute

Add similar questions
Adjust reading levels
Convert to real-world scenario
Translate activity
More...

10 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Type of estimation except

apprropriate estimation

approximate estimation

detailes estimation

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

During initial stage there are three parties involved except ......

Engineer

Architect

Client

Quantity Surveyor

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

In initial stage, the estimation will help

Owner of the project can be able to know whether the project can be undertaken within the available budget

Owner to choose the next location for new project

Owner to hire a new project manager

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

The person that will design and prepare the detailed drawing are

Quatity surveyor and architect

Architect and contractor

Architect and engineer

Engineer and contractor

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

In construction stage, contractor will prepare the

As built drawing

Sketch desgin

Architecture drawing

Structure drawing

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

In pyramid cost model, the unit used during brief stage are

unit and space

element and features

unit and element

space and features

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Following are function of estimation except

Guide the decision making among two or there possible options

Identifying early cost from the decision making

Guideline to the designer during selecting material and size the project to fall within the owner budget

Contractor to figure their dream car

Access all questions and much more by creating a free account

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

Already have an account?