006 Hot Water Quiz

006 Hot Water Quiz

Professional Development

20 Qs

quiz-placeholder

Similar activities

Unit4_MS_Magnetic Materials

Unit4_MS_Magnetic Materials

Professional Development

20 Qs

DTA Kaun Banega QuizPati - Theme: General Knowledge

DTA Kaun Banega QuizPati - Theme: General Knowledge

Professional Development

20 Qs

PDEC201 - Concepts of Observation/Assessment in ECCE

PDEC201 - Concepts of Observation/Assessment in ECCE

Professional Development

20 Qs

Managing Spills (Procedures)

Managing Spills (Procedures)

Professional Development

19 Qs

LA BATERÍA

LA BATERÍA

Professional Development

20 Qs

WS Area Jawa Bali 2020

WS Area Jawa Bali 2020

Professional Development

20 Qs

Product Quiz

Product Quiz

Professional Development

15 Qs

CPR_Quiz_Arrays and strings

CPR_Quiz_Arrays and strings

Professional Development

20 Qs

006 Hot Water Quiz

006 Hot Water Quiz

Assessment

Quiz

Professional Development

Professional Development

Practice Problem

Hard

Created by

George Harding

Used 22+ times

FREE Resource

AI

Enhance your content in a minute

Add similar questions
Adjust reading levels
Convert to real-world scenario
Translate activity
More...

20 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

At which one of the following temperature ranges should hot water be stored?

30% – 35%

40% – 45%

50% – 55%

60% – 65%

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which one of the following is the minimum size of an open vent pipe from a hot water cylinder?

15 mm.

22 mm.

28 mm.

35 mm.

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which one of the following component parts is installed after the incoming stop valve?

Drain off.

Air vent.

By-pass valve.

Water meter.

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which one of the following is the maximum depth a water main service should be laid?

750 mm.

1000 mm.

1350 mm.

1650 mm.

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

To ensure correct operation, a single feed indirect cylinder requires which one of the following to be formed?

A heat exchanger.

An air bubble.

An annulus.

A flute.

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which one of the following is used by gravity primary pipework to circulate the water?

A circulating pump.

Conduction.

Radiation.

Convection.

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which one of the following is the minimum distance the distribution pipe from the cylinder should be installed horizontally before it connects to the open vent pipe?

450 mm.

750 mm.

1350 mm.

1650 mm.

Create a free account and access millions of resources

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

Already have an account?