Reviewer Long Quiz ELEC 02 LC

Reviewer Long Quiz ELEC 02 LC

University

80 Qs

quiz-placeholder

Similar activities

Neurociencia Quiz Nivel 3

Neurociencia Quiz Nivel 3

University

84 Qs

Kisi-Kisi_Keterampilan Interpersonal (UAS)

Kisi-Kisi_Keterampilan Interpersonal (UAS)

University

80 Qs

TPS (1)

TPS (1)

12th Grade - University

80 Qs

Test 1

Test 1

University

84 Qs

Ujian Tengah Semester Anfis Sem.1 TA.2019-2020.

Ujian Tengah Semester Anfis Sem.1 TA.2019-2020.

University

80 Qs

UTS  Evaluasi Pembelaan

UTS Evaluasi Pembelaan

University

80 Qs

Literatura

Literatura

University

76 Qs

PARCIAL 1 - 2024-1

PARCIAL 1 - 2024-1

University

80 Qs

Reviewer Long Quiz ELEC 02 LC

Reviewer Long Quiz ELEC 02 LC

Assessment

Quiz

Other

University

Practice Problem

Medium

Created by

LEO LUIS O. GATCHALIAN

Used 6+ times

FREE Resource

AI

Enhance your content in a minute

Add similar questions
Adjust reading levels
Convert to real-world scenario
Translate activity
More...

80 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What types of activities are addressed in hangar maintenance?

a) Aircraft painting and interior modifications
b) Routine line checks and inspections
c) Ground support equipment repairs

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What are preliminary "C" check activities?

a) Opening panels and conducting visual inspections
b) Engine removal and installation
c) Aircraft painting and modification

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

How is the work assigned during a "C" check?

a) According to the check schedule produced by PP&C
b) Based on the availability of mechanics
c) Randomly assigned to different work centers

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the final step in completing a "C" check?

a) Inspection, stamping, and approval by quality control
b) Notifying MCC and flight operations of the availability of the aircraft
c) Towing the aircraft from the hangar to the ramp

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the purpose of morning meetings in the M&E operation?

a) Addressing the current maintenance status
b) Conducting routine inspections
c) Planning aircraft modifications

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which shop handles various types of sheet metal work?

a) Engine shop
b) Avionics shop
c) Sheet metal shop

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What activities are conducted in the engine shop?

a) Bench work and engine buildup
b) Aircraft painting and interior modifications
c) Avionics system installations

Create a free account and access millions of resources

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

Already have an account?