Search Header Logo

ASME B31.4 M3

Authored by nns s nsbs

Professional Development

Professional Development

Used 1+ times

ASME B31.4 M3
AI

AI Actions

Add similar questions

Adjust reading levels

Convert to real-world scenario

Translate activity

More...

    Content View

    Student View

6 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Personnel qualified for critical construction activities shall be qualified for all but which of the following?

Operation of a pipeline

Directional drilling equipment

Blasting operations

Operation of construction equipment

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Pipes that need to change direction are required to conform to the contour of the ditch with the following tools except for:

elbows

filling the ditch

mitred bends

factory-made bends

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

True or False? Welding requirements in the code apply to longitudinal or spiral joints.

True

False

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Flange joints shall be fitted up so that the gasket contact faces are ……. on the gasket and tightened uniformly.

 

Flush

Off-center

Orthogonal

Rotated

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Free water is considered to be …… depending on the situation it is being transported.

Toxic

Radioactive

Corrosive

Neutral

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which standard may be used as a
guide for minimum stress-relieving and heat-treating requirements?

ASME B31.3


ASME BPVC Section VIII, Division 1

ASME BPVC Section VIII, Division 2

All of the above

Access all questions and much more by creating a free account

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

Already have an account?

Discover more resources for Professional Development