
API 570 Sec. 5
Authored by nns s nsbs
Professional Development
Professional Development
Used 2+ times

AI Actions
Add similar questions
Adjust reading levels
Convert to real-world scenario
Translate activity
More...
Content View
Student View
7 questions
Show all answers
1.
MULTIPLE CHOICE QUESTION
10 mins • 1 pt
What shall be done when developing inspection plan for piping systems that operate at elevated temperatures [above 750 °F (400 °C)] to identify susceptibilities to credible damage mechanisms
?
consult corrosion specialist
specify use of high temperature probe for UT
refer API 574 to determine the extent of examination
define any special access and preparation needed
2.
MULTIPLE CHOICE QUESTION
10 mins • 1 pt
Safety precautions are to be implemented for inspection preparation to:
define the location of the expected damage
eliminate exposure to hazardous fluids, energy sources, and physical hazards
review the piping system’s prior inspection
results
identify the next inspection date for each inspection type
3.
MULTIPLE SELECT QUESTION
10 mins • 1 pt
As per API 570, the presence or potential of damage in piping systems is dependent upon its_____ (multiple answers)
design
material of construction
operating conditions
workmanship
4.
MULTIPLE CHOICE QUESTION
10 mins • 1 pt
Specific attention is needed for the following credible types of deterioration except:
CUI
soil corrosion for buried piping
fatigue cracking
general corrosion
5.
MULTIPLE CHOICE QUESTION
10 mins • 1 pt
API 570 lists different types of inspection and surveillance. Which of the following is not included?
Internal and external VI
OSI
mechanical testing
6.
MULTIPLE CHOICE QUESTION
10 mins • 1 pt
More CMLs should be selected for corrosive piping systems with any of the following characteristics EXCEPT:
higher potential for creating a safety or environmental emergency in the event of a leak
higher expected or experienced corrosion rates
higher potential for localized corrosion
long, straight-run piping systems
7.
MULTIPLE CHOICE QUESTION
10 mins • 1 pt
What is the minimum temperature during the hydro test of piping with thickness of 1.25"?
10 °F (6 °C) above the MDMT
30 °F (17 °C) above the MDMT
120 °F (50 °C)
ambient temperature
Access all questions and much more by creating a free account
Create resources
Host any resource
Get auto-graded reports

Continue with Google

Continue with Email

Continue with Classlink

Continue with Clever
or continue with

Microsoft
%20(1).png)
Apple
Others
Already have an account?
Similar Resources on Wayground
10 questions
FUTURES THINKING & SCENARIO PLANNING
Quiz
•
Professional Development
10 questions
ASM Global - EXPERIENCE
Quiz
•
Professional Development
10 questions
How Far You Know BINUS?
Quiz
•
Professional Development
6 questions
About Dexcom
Quiz
•
Professional Development
10 questions
Software Security
Quiz
•
University - Professi...
12 questions
Maslow's theory test
Quiz
•
Professional Development
10 questions
Tools of KPI
Quiz
•
Professional Development
10 questions
Applied Networking
Quiz
•
Professional Development
Popular Resources on Wayground
7 questions
History of Valentine's Day
Interactive video
•
4th Grade
15 questions
Fractions on a Number Line
Quiz
•
3rd Grade
20 questions
Equivalent Fractions
Quiz
•
3rd Grade
25 questions
Multiplication Facts
Quiz
•
5th Grade
22 questions
fractions
Quiz
•
3rd Grade
15 questions
Valentine's Day Trivia
Quiz
•
3rd Grade
20 questions
Main Idea and Details
Quiz
•
5th Grade
20 questions
Context Clues
Quiz
•
6th Grade