PPS SEMI FINAL QUIZ 3.2D-3.3

PPS SEMI FINAL QUIZ 3.2D-3.3

Professional Development

20 Qs

quiz-placeholder

Similar activities

Pokémon Master Challenge

Pokémon Master Challenge

Professional Development

15 Qs

Friday Fun & Learn

Friday Fun & Learn

Professional Development

15 Qs

OTE Quiz

OTE Quiz

Professional Development

20 Qs

proverbs 1

proverbs 1

Professional Development

15 Qs

Pre existing damage NETK3-04

Pre existing damage NETK3-04

Professional Development

18 Qs

No-Code Chatbot Development Quiz

No-Code Chatbot Development Quiz

Professional Development

20 Qs

Lesson: giving direction

Lesson: giving direction

Professional Development

18 Qs

Debate Calidad VOC 2023

Debate Calidad VOC 2023

Professional Development

15 Qs

PPS SEMI FINAL QUIZ 3.2D-3.3

PPS SEMI FINAL QUIZ 3.2D-3.3

Assessment

Quiz

Others

Professional Development

Easy

Created by

Jasper Pelingon

Used 4+ times

FREE Resource

AI

Enhance your content in a minute

Add similar questions
Adjust reading levels
Convert to real-world scenario
Translate activity
More...

20 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the primary purpose of an emergency shutdown (ETS) in a turbine power plant?

To speed up turbine operations

To immediately stop the flow of steam and prevent turbine damage

To increase power output

To reduce condenser vacuum

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which of the following conditions would NOT typically trigger an emergency shutdown?

High bearing temperature

Normal oil sump levels

Excessive turbine vibration

Fire in the turbine hall

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What action should an operator take first when performing a manual turbine trip?

Check the rotor deceleration

Press the Emergency Stop Button

Start the post-trip cooling procedures

Engage the turning gear

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What role does the turning gear play during an emergency shutdown procedure?

Stops steam flow immediately

Increases turbine speed

Ensures even cooling by slowly rotating the turbine rotor

Reduces lubricating oil temperature

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which component is responsible for instantly cutting off steam flow during a turbine emergency trip?

Turning gear

Oil sump

Trip valve

Condenser vacuum pump

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

If the condenser vacuum alarm is triggered, which response is most appropriate?

Decrease oil flow to bearings

Investigate for possible air ingress and cooling water issues

Activate the turning gear immediately

Increase turbine speed to compensate

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Why is it important to monitor oil supply to bearings throughout the shutdown process?

To increase turbine speed

To prevent heat damage and ensure proper lubrication

To maintain steam flow

To reduce rotor deceleration

Create a free account and access millions of resources

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

By signing up, you agree to our Terms of Service & Privacy Policy

Already have an account?