CPE649: SCHEDULED WASTE

CPE649: SCHEDULED WASTE

University

25 Qs

quiz-placeholder

Similar activities

LEVELLING FOR CIVIL ENGINEERING

LEVELLING FOR CIVIL ENGINEERING

University

20 Qs

Online Webinar by Krunal Talsaniya

Online Webinar by Krunal Talsaniya

University

20 Qs

Machine Learning

Machine Learning

University

20 Qs

Artificial Intelligence CT-4

Artificial Intelligence CT-4

University

20 Qs

Untitled Quiz

Untitled Quiz

1st Grade - University

20 Qs

GREEN TECHNOLOGY COMPLIANCE

GREEN TECHNOLOGY COMPLIANCE

University

20 Qs

Environmental Studies Quiz

Environmental Studies Quiz

University

20 Qs

Flue Gas Analysis

Flue Gas Analysis

University

20 Qs

CPE649: SCHEDULED WASTE

CPE649: SCHEDULED WASTE

Assessment

Quiz

Engineering

University

Practice Problem

Hard

Created by

NORASMAH MOHAMMED MANSHOR

Used 2+ times

FREE Resource

AI

Enhance your content in a minute

Add similar questions
Adjust reading levels
Convert to real-world scenario
Translate activity
More...

25 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

What is scheduled waste?

Recyclable waste such as paper, box and plastic
Any waste falling within the categories of waste listed in the first schedule, Environmental Quality (Scheduled Wastes) Reg 2005
Domestic waste from food, consumable items etc.
Waste from construction activities such as debris.

2.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

Which one is NOT a legal requirements of Scheduled Wastes?

GUIDELINES FOR PACKAGING, LABELLING AND STORAGE OF SCHEDULED WASTES IN MALAYSIA
Environmental Quality (Scheduled Wastes) regulations 2009
Environmental Quality (Scheduled Wastes) regulations 2005
Environmental Quality Act 1974

3.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

The scheduled wastes label shall be a square set at an angle of 45 degrees. The dimension of the label shall not be

less than 10 mm by 10 mm
more than 10 mm by 10 mm
more than 100 mm by 100 mm
less than 100 mm by 100 mm

4.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

Select WRONG statement on requirements of scheduled wastes storage area.

The floor of the storage area and loading and unloading area must be covered with concrete or any suitable lining material, free of cracks and gaps.
The loading and unloading area should be designed to contain any spillage.
The storage area should be equipped with ventilation system for volatile wastes.
The storage place should be sheltered or roofed with suitable covering material.

5.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

Select WRONG statement of scheduled waste storage.

Store for 180 days or less after its first generation date.
Storage quantity accumulated on site more than 20MT after grant a written approval from Director General.
Storage quantity accumulated on site not more than 20MT
Storage quantity accumulated on site more than 20MT after grant a written approval from Director General with conditions only.

6.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

How long the scheduled waste is allowed to be stored at the premised?

180 days
6 months
3 months
120 days

7.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

What is the maximum of quantity is allowed to be stored in the premise according to Environmental Quality Act 1974 and its regulation?

10 MT
20 MT
30 MT
40 MT

Create a free account and access millions of resources

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

By signing up, you agree to our Terms of Service & Privacy Policy

Already have an account?