CPE649: SCHEDULED WASTE

CPE649: SCHEDULED WASTE

University

25 Qs

quiz-placeholder

Similar activities

Pipe and Threading Knowledge Quiz

Pipe and Threading Knowledge Quiz

University

27 Qs

Tools & Equipment

Tools & Equipment

11th Grade - University

27 Qs

Intro to CE Quiz 2 (CE Fundamentals)

Intro to CE Quiz 2 (CE Fundamentals)

University

20 Qs

Cloud Computing Unit 1

Cloud Computing Unit 1

University

20 Qs

Unit 2 CA Review

Unit 2 CA Review

7th Grade - University

20 Qs

Gantt Charts in Project Management

Gantt Charts in Project Management

12th Grade - University

23 Qs

Flight Plans & Google maps Tutorial

Flight Plans & Google maps Tutorial

7th Grade - University

20 Qs

Green Engineering

Green Engineering

University

20 Qs

CPE649: SCHEDULED WASTE

CPE649: SCHEDULED WASTE

Assessment

Quiz

Engineering

University

Hard

Created by

NORASMAH MOHAMMED MANSHOR

Used 2+ times

FREE Resource

25 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

What is scheduled waste?
Recyclable waste such as paper, box and plastic
Any waste falling within the categories of waste listed in the first schedule, Environmental Quality (Scheduled Wastes) Reg 2005
Domestic waste from food, consumable items etc.
Waste from construction activities such as debris.

2.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

Which one is NOT a legal requirements of Scheduled Wastes?
GUIDELINES FOR PACKAGING, LABELLING AND STORAGE OF SCHEDULED WASTES IN MALAYSIA
Environmental Quality (Scheduled Wastes) regulations 2009
Environmental Quality (Scheduled Wastes) regulations 2005
Environmental Quality Act 1974

3.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

The scheduled wastes label shall be a square set at an angle of 45 degrees. The dimension of the label shall not be
less than 10 mm by 10 mm
more than 10 mm by 10 mm
more than 100 mm by 100 mm
less than 100 mm by 100 mm

4.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

Select WRONG statement on requirements of scheduled wastes storage area.
The floor of the storage area and loading and unloading area must be covered with concrete or any suitable lining material, free of cracks and gaps.
The loading and unloading area should be designed to contain any spillage.
The storage area should be equipped with ventilation system for volatile wastes.
The storage place should be sheltered or roofed with suitable covering material.

5.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

Select WRONG statement of scheduled waste storage.
Store for 180 days or less after its first generation date.
Storage quantity accumulated on site more than 20MT after grant a written approval from Director General.
Storage quantity accumulated on site not more than 20MT
Storage quantity accumulated on site more than 20MT after grant a written approval from Director General with conditions only.

6.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

How long the scheduled waste is allowed to be stored at the premised?
180 days
6 months
3 months
120 days

7.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

What is the maximum of quantity is allowed to be stored in the premise according to Environmental Quality Act 1974 and its regulation?
10 MT
20 MT
30 MT
40 MT

Create a free account and access millions of resources

Create resources
Host any resource
Get auto-graded reports
or continue with
Microsoft
Apple
Others
By signing up, you agree to our Terms of Service & Privacy Policy
Already have an account?