Carpentry EOPA Part 4

Carpentry EOPA Part 4

10th Grade

39 Qs

quiz-placeholder

Similar activities

unit 104 powerpoint 5 Communication in Construction

unit 104 powerpoint 5 Communication in Construction

10th Grade

44 Qs

Swimming

Swimming

2nd Grade - University

40 Qs

PTS GAMBAR TEKNIK KELAS 10

PTS GAMBAR TEKNIK KELAS 10

10th Grade

40 Qs

Carpentry 1 Orientation to the Trade

Carpentry 1 Orientation to the Trade

9th - 12th Grade

37 Qs

Carpentry EOPA Part 4

Carpentry EOPA Part 4

Assessment

Quiz

Construction

10th Grade

Practice Problem

Easy

Created by

Jacci Robinson

Used 11+ times

FREE Resource

AI

Enhance your content in a minute

Add similar questions
Adjust reading levels
Convert to real-world scenario
Translate activity
More...

39 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What type of defect in lumber is characterized by irregularly shaped cavities or holes caused by insects

Checks

Wane

Decayed wood

Insect damage

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the MAIN objective when cutting and installing paneling while trimming to fit in prescribed location

Randomly adjust panel sizes

To speed up installation process

To ensure fit and finish is precise and neat

To minimize the waste and leftover material

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

When using CDX plywood for roof sheathing, which side of the plywood is placed up

side with markings

either

D side

C side

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What type of defect in lumber is caused by the presence of small, shallow depressions on the surface of the wood, often resulting from the drying process

Decayed wood

Checks

Insect damage

Honeycomb

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

When constructing a built-in, where can one find specified sizes, shapes, and finishes

Builders can use personal judgment for these elements, so they are not specified anywhere

Written on the drywall for where the built-in will be placed

Projects blueprints or plans

Owners decide these elements, so the builder should leave them unfinished

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Complete the following statement with the BEST choice.

Nail, stakes, and ties shall be removed from forms _________

When sorting

When directed

For safety

Prior to reuse

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

When building closets, why is it MOST important to follow blueprint

Closet placement is flexible, so it is unimportant to follow the blueprint

Closets must be located in the correct location, so it is important to follow the blueprint

Codes do not require closets

Closets sizes are left up to the builder, so it is unimportant to follow the blueprint

Create a free account and access millions of resources

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

Already have an account?