1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

When is planning permission not required for a building?

When the building is less than 50 cubic metres

When the building is more than 50 cubic metres

For all buildings in a conservation area

For listed buildings only

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What must be included in the detailed sequence of work before demolishing a building?

Isolation of all services and risk assessments

Planning permission and architectural designs

Environmental impact reports and community meetings

Financial assessments and market analysis

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the purpose of isolating services such as gas, electricity, water supply, and telecommunications in construction and building services?

To prevent the release of toxic and explosive gases

To increase the speed of construction

To reduce the cost of materials

To enhance the aesthetic appeal of the building

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What should risk assessments and method statements include according to the document?

General guidelines for construction aesthetics

Specific risks and hazards associated with removal and demolition

A list of preferred construction materials

A timeline for project completion

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What must be considered before any demolition can begin?

The cost of materials

The environmental impact

The number of workers

The weather conditions

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is a common practice to prevent dangerous dusts like asbestos from leaving the site?

Using water sprays

Manually removing it

Covering it with plastic sheets

Using air filters

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Why must gas supplies be safely disconnected before demolition?

To prevent noise pollution

To reduce the chance of an explosion or fire

To save energy

To prevent air pollution

Access all questions and much more by creating a free account

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

Already have an account?