1.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
Where is the feed and expansion cistern commonly located in an open vented system?
In the basement
In the loft
On the ground floor
Outside the building
2.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
What is the main purpose of the feed and expansion cistern in the system?
To cool the water
To filter the water
To allow the heated water to expand and operate at atmospheric pressure
To increase water pressure
3.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
At what level should the base of the feed and expansion cistern be placed?
Above the cold water storage cistern
Below the cold water storage cistern
At the same level as the cold water storage cistern
At ground level
4.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
What is the common size and color of the feed and expansion (F&E) cistern?
18-litre, black
20-litre, white
15-litre, blue
22-litre, red
5.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
Where is the 15mm cold feed located in relation to the F&E cistern?
On top of the F&E
To the side of the F&E
Below the F&E
Inside the F&E
6.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
What is the minimum height the 22mm open vent must rise above the water level?
300mm
450mm
500mm
600mm
7.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
How far above the circulator should the F&E be located?
0.5 metres
1 metre
1.5 metres
2 metres
Access all questions and much more by creating a free account
Create resources
Host any resource
Get auto-graded reports

Continue with Google

Continue with Email

Continue with Classlink

Continue with Clever
or continue with

Microsoft
%20(1).png)
Apple
Others
Already have an account?