Soundness Testing in Piping Systems

Soundness Testing in Piping Systems

12th Grade

48 Qs

quiz-placeholder

Similar activities

Rec-101 PDI Final

Rec-101 PDI Final

KG - University

50 Qs

Soundness Testing Quiz

Soundness Testing Quiz

12th Grade

47 Qs

Cold Water Mock 2

Cold Water Mock 2

12th Grade

45 Qs

Land Based L2 Engineering Quiz

Land Based L2 Engineering Quiz

12th Grade

53 Qs

6035 Site Prep Quiz 2

6035 Site Prep Quiz 2

12th Grade

44 Qs

Engine Management Sistem EFI

Engine Management Sistem EFI

12th Grade

50 Qs

ESS Weather Review

ESS Weather Review

10th Grade - University

43 Qs

JRCTC  HVAC 1 & 2  FALL 2024 FINALS

JRCTC HVAC 1 & 2 FALL 2024 FINALS

12th Grade

49 Qs

Soundness Testing in Piping Systems

Soundness Testing in Piping Systems

Assessment

Quiz

Other

12th Grade

Hard

Created by

Stephen Morgan

FREE Resource

48 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What should be checked during a visual inspection before soundness testing?

Open ends, soldered joints, compression joints, clips

Pipe color, material type, length, diameter

Temperature, pressure, flow rate, volume

Weight, density, texture, flexibility

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the purpose of a soundness test in piping systems?

To ensure all joints are secure and leak-free

To measure the temperature of the system

To calculate the flow rate of the fluid

To determine the color of the pipes

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What types of pipes require different soundness tests?

Rigid pipes (copper and steel) and plastic pipes

Flexible pipes and metal pipes

Insulated pipes and non-insulated pipes

Large diameter pipes and small diameter pipes

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the first step in the testing and decommissioning process?

Set up equipment

Test period

Visual inspection

Final check

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which step comes immediately after the test period in the testing and decommissioning process?

Visual inspection

Set up equipment

Complete documentation

Final check

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the final step in the testing and decommissioning process?

Test period

Complete documentation

Final check

Set up equipment

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the first step in soundness testing for rigid pipes?

Attach the hydraulic test bucket

Slowly fill the system with water

Pump system up to 1.5 times the working pressure

Check for any pressure drop

Create a free account and access millions of resources

Create resources
Host any resource
Get auto-graded reports
or continue with
Microsoft
Apple
Others
By signing up, you agree to our Terms of Service & Privacy Policy
Already have an account?