Fire Officer p321

Fire Officer p321

12th Grade

6 Qs

quiz-placeholder

Similar activities

2Q TLE Lesson 4 and 5

2Q TLE Lesson 4 and 5

9th - 12th Grade

11 Qs

Drum Brake Maintenance

Drum Brake Maintenance

9th - 12th Grade

10 Qs

Unit 8: Jobs Quizizz

Unit 8: Jobs Quizizz

12th Grade

10 Qs

Ridels

Ridels

12th Grade

10 Qs

Jaringan Komputer Quiz

Jaringan Komputer Quiz

12th Grade

10 Qs

Fire Officer p321

Fire Officer p321

Assessment

Quiz

Others

12th Grade

Hard

Created by

Joshua Thompson

FREE Resource

6 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which of the following vehicles is considered for the ARU with a cost of $17,786?

Compact four-door sedan

Midsized hybrid four-door sedan

Small all-wheel-drive hybrid SUV

Large four-wheel-drive SUV

2.

MATCH QUESTION

30 sec • 1 pt

Match the following ARU vehicle types with their respective costs: 1) Compact four-door sedan 2) Small all-wheel-drive hybrid SUV 3) Large four-wheel-drive SUV.

1-A

$15,470

2-B

$33,948

3-C

$24,765

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

The ARU vehicle should be the same as other staff and command vehicles, a small _________.

all-wheel-drive hybrid SUV

midsized hybrid four-door sedan

compact four-door sedan

large four-wheel-drive SUV

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which of the following vehicles is considered for the ARU with a cost of $17,786?

Compact four-door sedan

Midsized hybrid four-door sedan

Small all-wheel-drive hybrid SUV

Large four-wheel-drive SUV

5.

MATCH QUESTION

30 sec • 1 pt

Match the following ARU sections with their descriptions:

Details the vehicle options and costs

Describes the office space and equipment needed

Discusses the cost of fire fighter protective clothing

Details the vehicle options and costs

Describes the office space and equipment needed

Shows the first-year capital expenditures

Shows the first-year capital expenditures

Discusses the cost of fire fighter protective clothing

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

The ARU project has an annual operating and personnel cost of ______.

$451,512

$170,800

$33,948

$24,765