Power System Quiz 2

Power System Quiz 2

Professional Development

10 Qs

quiz-placeholder

Similar activities

MARKER FITTER MODULE 01  INTRODUCTION TO MARKING AND FITTING

MARKER FITTER MODULE 01 INTRODUCTION TO MARKING AND FITTING

Professional Development

11 Qs

3003 LO4 11 RCDs Voltage Current & Equipment Class Measurement

3003 LO4 11 RCDs Voltage Current & Equipment Class Measurement

Professional Development

12 Qs

Risk assessment

Risk assessment

Professional Development

10 Qs

8. Earthing & Bonding, Clearances, Safety and Quality Procedures

8. Earthing & Bonding, Clearances, Safety and Quality Procedures

Professional Development

15 Qs

ERB 5,6 & 7

ERB 5,6 & 7

Professional Development

15 Qs

ERB 8.9 & 10

ERB 8.9 & 10

Professional Development

15 Qs

Test D3 Next Gen SAP ABAP Cloud

Test D3 Next Gen SAP ABAP Cloud

Professional Development

10 Qs

Group4 Activity_Common Control Challenges

Group4 Activity_Common Control Challenges

Professional Development

14 Qs

Power System Quiz 2

Power System Quiz 2

Assessment

Quiz

Engineering

Professional Development

Practice Problem

Hard

Created by

Mohit Jambu

Used 1+ times

FREE Resource

AI

Enhance your content in a minute

Add similar questions
Adjust reading levels
Convert to real-world scenario
Translate activity
More...

10 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Single line diagram of which of the following power system is possible?

Power system with LG fault

Balanced power system

Power system with LL fault

Power system with LLG fault

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

A power system will have greater flexibility of operation if they have __________

Only Base load plants operating in combination

Various types of power plants operating in combination

Only Peak load plants operating in combination

Only thermal power plants operating in combination

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Single line diagram does not represents:

Ratings of machines

Neutral wire of transmission lines

Delta connection of transformer winding

Star connection of transformer winding

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

In the impedance diagram different power system elements are represented by symbols.

False

True

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

In the combined operation of several power plants the reserve capacity requirement is reduced.

False

True

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

For a given power system, it's zero and maximum regulation will occur at the impedance angle of

45

60

35

50

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

A 200 bus power system has 160 PQ bus. For achieving a load flow solution by N-R in polar coordinates, the minimum number of simultaneous equation to be solved is ___________

359

334

357

345

Access all questions and much more by creating a free account

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

Already have an account?