Search Header Logo

Headers

Authored by James Walz

Other

12th Grade

Headers
AI

AI Actions

Add similar questions

Adjust reading levels

Convert to real-world scenario

Translate activity

More...

    Content View

    Student View

9 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

The main job of a structural header is to:

Define the width of the rough opening

Carry any weight from above to each side of the rough opening

Hold the king and jack studs securely in place

All of these

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Headers are located:

Above a rough opening

Below a rough opening

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Headers can be constructed of dimensional lumber or engineered lumber

True

False

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Larger rough openings can require:

Deeper headers

Thicker headers

More than one king stud per side

More than one jack stud per side

Any of these

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Headers can only be installed in full contact with the top plate to be loadbearing

True

False

6.

MULTIPLE SELECT QUESTION

30 sec • 1 pt

Headers that do not have the same thickness as the wall they are placed in allow room for:

Settling

Wiring

Plumbing

Insulation

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

According to Table R602.7(1), what is the longest span listed for a single 2x10 header used in a single story building?

5’ 1”

6’

4’7”

9’

Access all questions and much more by creating a free account

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

Already have an account?