Lean Manufacturing Tools and Techniques Quiz

Lean Manufacturing Tools and Techniques Quiz

12th Grade

20 Qs

quiz-placeholder

Similar activities

GCSE Design and Technology: Production Techniques Quiz

GCSE Design and Technology: Production Techniques Quiz

10th Grade - University

15 Qs

S3ME QUIZ MODULE 3

S3ME QUIZ MODULE 3

2nd Grade - University

16 Qs

Level 2 Materials Quiz

Level 2 Materials Quiz

12th Grade

15 Qs

Revision: ICM 804 2025 Part 2

Revision: ICM 804 2025 Part 2

12th Grade

20 Qs

PLTW EOC Eng Ess Test Review 3

PLTW EOC Eng Ess Test Review 3

9th - 12th Grade

20 Qs

Measurement Overview

Measurement Overview

9th - 12th Grade

20 Qs

Foundations of Engineering Final Spring 2025

Foundations of Engineering Final Spring 2025

9th - 12th Grade

20 Qs

Lean Manufacturing Tools and Techniques Quiz

Lean Manufacturing Tools and Techniques Quiz

Assessment

Quiz

Engineering

12th Grade

Practice Problem

Hard

Created by

Wayground Content

FREE Resource

AI

Enhance your content in a minute

Add similar questions
Adjust reading levels
Convert to real-world scenario
Translate activity
More...

20 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which of the following is NOT one of the 5S steps?

Sort

Sustain

Simplify

Standardise

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the primary goal of the 'Standardise' step in the 5S methodology?

To create uniform procedures

To increase production speed

To reduce employee numbers

To improve product quality

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the main function of a Kanban system?

To track employee performance

To manage inventory levels

To schedule maintenance

To improve product quality

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

In the 5S methodology, what does the 'Sort' step involve?

Organising tools by colour

Removing unnecessary items

Cleaning the workspace

Labelling all equipment

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

In Lean Manufacturing, what is the term for excess inventory that is not immediately needed?

Buffer stock

Surplus

Waste

Reserve

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What does the 'Shine' step in the 5S methodology focus on?

Implementing new technology

Cleaning and maintaining the workspace

Training employees

Reducing costs

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which tool is used to visualise the flow of materials and information in a process?

Kanban

Value Stream Mapping

5S

JIT

Create a free account and access millions of resources

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

Already have an account?