Assignment-1

Assignment-1

Professional Development

5 Qs

quiz-placeholder

Similar activities

Quiz on Stress and Strain

Quiz on Stress and Strain

Professional Development

10 Qs

Toppling Landslide Execution

Toppling Landslide Execution

Professional Development

8 Qs

Welding Plate To Plate 2F 2025

Welding Plate To Plate 2F 2025

Professional Development

9 Qs

Capacitación BPM - SISO

Capacitación BPM - SISO

Professional Development

7 Qs

ERB Topik 6

ERB Topik 6

Professional Development

5 Qs

Productividad

Productividad

Professional Development

10 Qs

Quiz sobre Operaciones de Mecanizado en el Torno

Quiz sobre Operaciones de Mecanizado en el Torno

Professional Development

10 Qs

Nonwoven Fabric Basic

Nonwoven Fabric Basic

Professional Development

10 Qs

Assignment-1

Assignment-1

Assessment

Quiz

Engineering

Professional Development

Easy

Created by

Bhagyashree Patra

Used 1+ times

FREE Resource

5 questions

Show all answers

1.

FILL IN THE BLANK QUESTION

1 min • 1 pt

The process of removing excess material from a workpiece to achieve the desired shape is called

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

A ship floats in seawater because of which principle?

Pascal’s Law

Archimedes’ Principle

Bernoulli’s Principle

Newton’s Third Law

3.

FILL IN THE BLANK QUESTION

1 min • 1 pt

If a production line is experiencing frequent breakdowns due to poor maintenance, a __________ maintenance strategy should be implemented to prevent failures before they occur.

4.

FILL IN THE BLANK QUESTION

1 min • 1 pt

When selecting a manufacturing process, factors such as material properties, cost, and production volume must be considered in a __________ analysis.

5.

FILL IN THE BLANK QUESTION

1 min • 1 pt

To reduce waste in a manufacturing system, a company can implement a __________ system that focuses on continuous improvement and eliminating non-value-added activities.