Assignment-1

Assignment-1

Professional Development

5 Qs

quiz-placeholder

Similar activities

FMD Quality Manual - Multiple Choice Quiz

FMD Quality Manual - Multiple Choice Quiz

Professional Development

10 Qs

Toppling Landslide Execution

Toppling Landslide Execution

Professional Development

8 Qs

Solar Energy Quiz

Solar Energy Quiz

Professional Development

10 Qs

Engineering April Quiz

Engineering April Quiz

Professional Development

10 Qs

AMP ASSIGNMENT

AMP ASSIGNMENT

Professional Development

10 Qs

Part 147 / Part 66 Final quiz

Part 147 / Part 66 Final quiz

Professional Development

8 Qs

Propiedades de Materiales

Propiedades de Materiales

Professional Development

8 Qs

Routine Test / ITO

Routine Test / ITO

Professional Development

10 Qs

Assignment-1

Assignment-1

Assessment

Quiz

Engineering

Professional Development

Easy

Created by

Bhagyashree Patra

Used 1+ times

FREE Resource

5 questions

Show all answers

1.

FILL IN THE BLANK QUESTION

1 min • 1 pt

The process of removing excess material from a workpiece to achieve the desired shape is called

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

A ship floats in seawater because of which principle?

Pascal’s Law

Archimedes’ Principle

Bernoulli’s Principle

Newton’s Third Law

3.

FILL IN THE BLANK QUESTION

1 min • 1 pt

If a production line is experiencing frequent breakdowns due to poor maintenance, a __________ maintenance strategy should be implemented to prevent failures before they occur.

4.

FILL IN THE BLANK QUESTION

1 min • 1 pt

When selecting a manufacturing process, factors such as material properties, cost, and production volume must be considered in a __________ analysis.

5.

FILL IN THE BLANK QUESTION

1 min • 1 pt

To reduce waste in a manufacturing system, a company can implement a __________ system that focuses on continuous improvement and eliminating non-value-added activities.