1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

1. Which of the following is a key difference between functional and non-functional requirements?

Functional requirements are mandatory, while non-functional requirements are optional.

Functional requirements focus on user expectations, while non-functional requirements focus on system behavior.

Functional requirements describe what the system should do, while non-functional requirements describe how the system should perform.

Functional requirements are captured in use cases, while non-functional requirements are captured in design documents.

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which of the following is NOT a cost driver in Intermediate COCOMO?

Required Software Reliability (RELY)

Analyst Capability (ACAP)

Application Experience (AEXP)

Lines of Code (LOC)

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the primary purpose of the Value Adjustment Factor (VAF) in Function Point Analysis?

To adjust the unadjusted function points (UFP) based on system characteristics

To calculate the lines of code (LOC)

To estimate the development time

To measure the complexity of the system

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which of the following is a key characteristic of the V-Model?

It focuses on risk management.

It emphasizes testing at each stage of development.

It delivers software in increments.

It is suitable for projects with changing requirements.

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

In COCOMO II, which model is used during the construction of the software?

Application Composition Model

Early Design Stage Model

Post-Architecture Stage Model

Detailed COCOMO Model

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which of the following is a measure of software size in Function Point Analysis?

Lines of Code (LOC)

Number of external inputs (EI)

Effort in person-months

Development time in months

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the formula for calculating Effort in COCOMO I?

Effort = a × (KLOC)^b

Effort = a × (FP)^b

Effort = a × (LOC)^b

Effort = a × (KLOC) + b

Access all questions and much more by creating a free account

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

Already have an account?