1.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
Where is the feed and expansion cistern commonly located in a system?
In the loft at the highest point of the system.
In the basement at the lowest point of the system.
Next to the boiler.
Outside the building.
2.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
At what level should the base of the F&E cistern be placed?
At the same level as the cold-water storage cistern.
Above the cold-water storage cistern.
Below the cold-water storage cistern.
At any level, it does not matter.
3.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
What is the common capacity of the F&E cistern?
10 litres
18 litres
25 litres
30 litres
4.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
What is the minimum rise required for the 22mm open vent from the primaries above the water level?
300mm
450mm
600mm
750mm
5.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
By what percentage will the system water expand when heated?
2%
4%
6%
8%
6.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
What is the primary function of the open vent pipe?
To increase water pressure
To provide a safety outlet and allow operation at atmospheric pressure
To heat the water
To filter impurities
7.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
What is the minimum height the vent needs to be above the water level?
300mm
450mm
600mm
150mm
Access all questions and much more by creating a free account
Create resources
Host any resource
Get auto-graded reports

Continue with Google

Continue with Email

Continue with Classlink

Continue with Clever
or continue with

Microsoft
%20(1).png)
Apple
Others
Already have an account?